Conditions / Refusal Reasons
That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, 24010-PL05 rev E, 24010-PL03 rev C, 22091-PL04Q, 24010-PL-02 A, EE-001, 24010-PL-07 A, 24010-PL-01 A, 24010-PL-22, SS-002 and SS-003, except as controlled or modified by conditions of this permission.
Reason: To secure the proper planning of the area in accordance with Development Plan policies.
The exterior of the development hereby permitted shall only be constructed in the materials specified on the plans/supporting documents hereby approved or in materials which shall previously have been approved in writing by the Local Planning Authority.
Reason: In the interests of the visual appearance of the development in accordance with Policies DES1, DES2 and ENV1 of the South Oxfordshire Local Plan 2035.
Except in the case of any building work hereby permitted, no change in the levels of the land shall take place unless in accordance with a detailed scheme which shall have been submitted to and approved in writing by the Local Planning Authority before any development commences on site. The scheme shall include details of existing and proposed ground levels.
Reason: In the interests of the visual appearance of the development and to minimise flood risk in accordance with Policies DES1, DES2, ENV1 and EP4 of the South Oxfordshire Local Plan 2035.
The flat roof areas of the dwelling hereby permitted shall not be used as a balcony, roof garden or similar amenity area without the grant of further specific permission from the local planning authority.
Reason: To protect the amenity of neighbours in accordance with Policy DES6 of the South Oxfordshire Local Plan 2035.
The tree protection details as shown on the approved Arboricultural Method Statement incorporating Tree Survey, Tree Protection Plan and Method Statement prepared by SJ Stephens Associates dated 3 July 2024 shall be put in place prior to any on site works including demolition and thereafter retained in situ for the duration of development.
Reason: To safeguard trees which are visually important in accordance with Policies ENV1, DES1, and DES2 of the South Oxfordshire Local Plan 2035.
The landscaping scheme as shown on the approved plan (Philip Wadge Architecture, ref: 22091/PL/25 F) shall be implemented prior to the first occupation or use of the approved development and thereafter be maintained in accordance with the approved scheme. In the event of any of the soft landscaping so planted dying or being seriously damaged or destroyed within 5 years of the completion of the development, replacement planting, as the case may be, of a species first approved by the Local Planning Authority, shall be planted and properly maintained in a position or positions first approved in writing by the Local Planning Authority.
Reason: To help to assimilate the development into its surroundings in accordance with Policies ENV1, DES1 and DES2 of the South Oxfordshire Local Plan 2035.
The biodiversity enhancements, as shown on the approved plan (Philip Wadge Architecture, ref: 22091/PL/25 F), shall be provided prior to the first occupation of the approved development and thereafter be maintained in accordance with the approved scheme unless otherwise agreed in writing by the Local Planning Authority.
Reason: To secure biodiversity enhancements onsite, in accordance with Policy ENV3 of the South Oxfordshire Local Plan 2035 and paragraphs 174 and 180 of the NPPF.
The surface water drainage scheme shall be implemented in accordance with the details agreed under approved under application P24/S2030/DIS prior to the occupation of the development hereby approved, unless otherwise agreed in writing by the Local Planning Authority.
Reason: To ensure the proper provision of surface water drainage and to ensure flooding is not exacerbated in the locality in accordance with Policy EP4 of the South Oxfordshire Local Plan 2035.
Prior to the first occupation of the development hereby approved, an Electric Vehicle Charging Point shall be installed for the dwelling and thereafter retained as such.
Reason: To ensure sustainable forms of transport in accordance with Policies TRANS5, ENV12 and EP1 of the South Oxfordshire Local Plan 2035.
Prior to first occupation of the dwelling, all carbon reduction energy efficiency measures shall be implemented in accordance with the Energy Statement hereby approved and a Verification Report shall be submitted to the Local Planning Authority and approved in writing. The Verification Report shall demonstrate (with photographic evidence) that the energy efficiency measures have been implemented. These measures shall be retained and maintained as such thereafter in accordance with the Energy Statement and Verification Report.
Reason: To ensure high standards of sustainable design and construction in accordance with Policy DES10 of the South Oxfordshire Local Plan 2035.
The external heating and energy generation systems agreed under application P24/S1510/DIS shall be installed on site in accordance with the agreed details and retained thereafter, unless otherwise agreed in writing by the Local Planning Authority prior to installation.
Reason: To ensure high standards of sustainable design and construction and an acceptable visual and amenity impact in accordance with Policies DES1, DES2, DES6, DES10, ENV1 and ENV12 of the South Oxfordshire Local Plan 2035.
That the buildings specified in the application to be demolished shall be demolished prior to the first occupation of the dwelling hereby permitted.
Reason: To ensure satisfactory comprehensive development in accordance with Policies DES1, DES2 and ENV1 of the South Oxfordshire Local Plan 2035.
Prior to the first use of the development hereby approved, full details of the offsite planting shown in Figure 3 (page 20) of the supporting Ecological Assessment (GS Ecology, 29/11/2023) shall be submitted to and approved in writing by the local planning authority. These details shall include a method statements for successful establishment and ongoing maintenance of the planting, along with previsions for remediation if planting should fail. Thereafter, the approved planting details shall be implemented prior to the first use of the development and thereafter maintained for a minimum period of 30 years.
Reason: To secure compliance with Policy ENV3 of the SOLP and paragraphs 180 and 186 of the NPPF.
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order revoking or re-enacting that Order), the enlargement, improvement or other alteration of any dwellinghouse as described in Schedule 2, Part 1, Class A of the Order shall not be undertaken without obtaining planning permission from the Local Planning Authority.
Reason: To safeguard the amenities of the occupiers of the adjoining properties and the character of the area in accordance with Policies DES1, DES2 and DES6 of the South Oxfordshire Local Plan 2035.
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order revoking or re-enacting that Order) the provision within the curtilage of the dwelling of any building, enclosure or swimming pool as described in Schedule 2, Part 1, Class E of the Order shall not be undertaken without obtaining planning permission from the Local Planning Authority.
Reason: To safeguard the amenities of the occupiers of the adjoining properties and the character of the area in accordance with Policies DES1, DES2 and DES6 of the South Oxfordshire Local Plan 2035.