Consultation / Notification
No further Representations on this application will be accepted.
Consultations / Notifications to date are shown below.
If the response has been scanned, you can access the document by clicking the folder icon alongside the relevant consultee. Folders with a
*
alongside them indicate new content within the folders (i.e. new documents added within the last 7 days)
Name / Number
Date Sent
Response Date
Scanned Response
Sonning Common Parish Council
Jess Moss (Parish Clerk)
Village Hall
Wood Lane
Sonning Common
Oxon
RG4 9SL
15 04 2025
Blackmore Barns
Blounts Court Road
Sonning Common
Reading
RG4 9NY
Heritage Officer (South and Vale)
07 04 2025
Ecology Team (South and Vale)
10 06 2025
Pond Farm
Blackmore Lane
Sonning Common
Reading
RG4 9NU
Blackmore Farm
Blackmore Lane
Sonning Common
Reading
RG4 9NU
Conditions / Refusal Reasons
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004.
That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, 0011, 0014, 0012, 0013, 090 PA 008, 090 PA 009, 090 PA 006, 009, 090 PA 005, 090 PA 007, 090 PA 002, I0422 T and 090 PA 001 A, except as controlled or modified by conditions of this permission.
Reason: To secure the proper planning of the area in accordance with Development Plan policies.
The exterior of the development hereby permitted shall only be constructed in the materials specified on the plans/supporting documents hereby approved or in materials which shall previously have been approved in writing by the Local Planning Authority.
Reason: In the interests of the visual appearance of the development in accordance with Policies DES1, DES2 and ENV1 of the South Oxfordshire Local Plan 2035.
Prior to the commencement of development, with the exception of any demolition, a full surface water drainage scheme in accordance with the surface water drainage hierarchy as set out in Part H of the Building Regulations, including details of the size, position and construction of drainage works, shall be submitted to, and approved in writing by, the Local Planning Authority. The drainage scheme shall be designed to accommodate a 1 in 100 year storm + 40% CC and shall be implemented in accordance with the approved details prior to the occupation of the development hereby approved.
It should be noted that SODC's Karstic susceptibility model identifies solution features within the immediate proximity. Therefore, the drainage scheme shall be supported by a "risk of subsidence assessment" undertaken by a Geotechnical Engineer. Intrusive dynamic probe testing may need to be undertaken to assess the risk of voids in the underlying chalk.
In accordance with Ciria C574 - in areas where dissolution features are known to be prevalent, soakaways should be avoided altogether, however if unavoidable they should be sited at least 20m away from any foundations. Where chalk is of low density, soakaways should be at least 10m away from any foundations. If 20m offsets for soakaways are required, it must be demonstrated that a 20m offset is available to position a soakaway from all on site and off site building foundations.
Reason: To ensure the proper provision of surface water drainage and to ensure flooding and risk of subsidence is not exacerbated in the locality in accordance with Policy EP4 of the South Oxfordshire Local Plan 2035.
The existing parking and turning areas shown on plan reference 090 PA 002 shall be retained unobstructed except for the parking of vehicles associated with the dwelling hereby permitted at all times unless otherwise agreed in writing by the Local Planning Authority.
Reason: In the interests of highway safety and in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
Prior to the occupation of the dwelling hereby permitted, a landscaping plan showing existing landscaping to be retained and proposed landscaping, shall be submitted to and approved in writing by the Local Planning Authority. These details shall include the identification of the existing trees and shrubs on the site to be retained and any trees or shrubs to be planted (noting species, location and spread). In the event of any of the trees or shrubs shown on the plan dying or being seriously damaged or destroyed within 5 years of the completion of the development, a new tree or shrub or equivalent number of trees or shrubs, as the case may be, of a species first approved by the Local Planning Authority, shall be planted and properly maintained in a position or positions first approved in writing by the Local Planning Authority.
Reason: To help to protect the setting of the listed building and character of the site in accordance with Policies ENV1, ENV6, ENV7, DES1 and DES2 of the South Oxfordshire Local Plan 2035.
Prior to the commencement of the development above new slab level, details (including specification, position, height, orientation) of a bat box to be integrated into the fabric of the development, shall be submitted to and approved in writing by the local planning authority. The choice and siting of the bat box shall be advised by a suitably qualified ecologist. Thereafter, the development shall be implemented in accordance with the approved details and the feature shall be provided prior to first use and retained and maintained thereafter.
Reason: To secure biodiversity enhancements onsite, in accordance with Policy ENV2 of the South Oxfordshire Local Plan, the South and Vale Joint Design Guide and paragraphs 187 and 193 of the NPPF.
Any external lighting will only be permitted in accordance with a lighting scheme to be submitted to and approved in writing by the Local Planning Authority prior to the first occupation of the development hereby approved. Details shall include:
a) Details of all the equipment uses, specific lamps, luminaries and columns with images.
b) For each luminaire a full technical specifications (e.g. wattage, colour rating)
c) Isolux diagrams overlaid over the site and adjacent areas
d) Details of lighting operation hours
e) Confirmation to which Institution of Lighting Engineers Environmental Management Zones the scheme conforms to.
Any such lighting shall be implemented in accordance with the approved details and directed downwards to prevent nuisance to adjoining residential occupiers from light spillage.
Reason: To protect the appearance of the area, the environment and wildlife, and local residents from light pollution in accordance with Policy ENV12 of the South Oxfordshire Local Plan 2035.
Prior to first occupation, all carbon reduction energy efficiency measures shall be implemented in accordance with the Energy Statement hereby approved and a Verification Report shall be submitted to the Local Planning Authority and approved in writing. The Verification Report shall demonstrate (with photographic evidence) that the energy efficiency measures have been implemented. These measures shall be retained and maintained as such thereafter in accordance with the Energy Statement and Verification Report.
Reason: To ensure high standards of sustainable design and construction in accordance with Policy DES10 of the South Oxfordshire Local Plan 2035.
An Electric Vehicle Charging Point shall be retained on site for use by the occupants of the dwelling hereby permitted.
Reason: To ensure sustainable forms of transport in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.