The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004.
That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, 20-019-F-011, 20-019-F-021, 20-019-F-010, 20-019-F-020, 20-019-M-001, 20-019-F-001 A and 20-019-S-010, except as controlled or modified by conditions of this permission.
Reason: To secure the proper planning of the area in accordance with Development Plan policies.
The exterior of the development hereby permitted shall only be constructed in the materials specified on the plans/supporting documents hereby approved or in materials which shall previously have been approved in writing by the Local Planning Authority.
Reason: In the interests of the visual appearance of the development in accordance with Policies DES1 and DES2 of the South Oxfordshire Local Plan 2035.
Prior to first occupation, all carbon reduction energy efficiency measures shall be implemented in accordance with the Energy Statement hereby approved and a Verification Report shall be submitted to the Local Planning Authority and approved in writing. The Verification Report shall demonstrate (with photographic evidence) that the energy efficiency measures have been implemented. These measures shall be retained and maintained as such thereafter in accordance with the Energy Statement and Verification Report.
Reason: To ensure high standards of sustainable design and construction in accordance with Policy DES10 of the South Oxfordshire Local Plan 2035.
Prior to the commencement of the development above new slab level, details (including specification, position, height, orientation) of a scheme of biodiversity enhancements to be provided, shall be submitted to and approved in writing by the local planning authority. The scheme shall be designed in conjunction with a suitably qualified ecologist and bird/bat boxes on buildings shall be integrated into the fabric of the development. A minimum number of biodiversity enhancement features shall be provided onsite as follows: two integrated bird boxes for house sparrow Passer domesticus or swift Apus apus, two integrated bat boxes, two bird boxes on retained trees and one hedgehog fence tunnel within each length of close-boarded fencing forming a plot boundary (arranged so that each plot is connected to at least two separate adjacent plots or to one other plot and open/public space as appropriate). Thereafter, the development shall be implemented in accordance with the approved details and all features provided prior to first use.
REASON: To secure biodiversity enhancements onsite, in accordance with Policy ENV2 of the South Oxfordshire Local Plan, The South and Vale Joint Design Guide and paragraphs 187d and 193d of the NPPF".
Related application(s):
P25/S3024/DISNo external lighting shall be installed on site unless and until a sensitive lighting strategy for bats is submitted to and approved in writing by the Local Planning Authority. The strategy shall:
a) identify those areas/features on site that are likely to be both particularly sensitive for bats and vulnerable to disturbance from artificial lighting, including: known or potential breeding sites, resting places, foraging areas or important routes used to access key areas of their territory.
b) show how and where external lighting will be installed (through provision of appropriate lighting plans, isolux contour maps and technical specifications) so that it can be clearly demonstrated that areas to be lit will not disturb or prevent bats using their territory or having access to their breeding sites or resting places.
All external lighting shall be installed in accordance with the specifications and locations set out in the strategy. Under no circumstances should any other external lighting be installed without the prior consent from the local planning authority.
REASON: to avoid impacts on bats from insensitive external lighting in line with Policy ENV2 of the South Oxfordshire Local Plan.
No development shall take place, including vegetation clearance, demolition or ground works, unless and until a Construction Method Statement for protected species is submitted to and approved in writing by the Local Planning Authority. This shall be produced by a suitably qualified ecologist and shall describe Reasonable Avoidance Measures to be employed during construction to avoid impacts on:
1. Badger, hedgehog and other small animals (including measures to be employed to avoid these species becoming trapped in excavations)
2. Nesting birds (including vegetation clearance timings and/or arrangements for ecological supervision)
The Construction Method Statement shall include the procedure to be followed in each case if a protected species is found on site. The approved Construction Method Statement shall be adhered to and implemented throughout the construction period strictly in accordance with the approved details.
REASON: To avoid impacts on protected species during construction, in line with Policy ENV2 of the South Oxfordshire Local Plan.
Related application(s):
P25/S3024/DISPrior to the commencement of any site works (including demolition or site clearance) a protected area shall be designated for all existing trees which are shown to be retained, and the trees shall be protected in accordance with a scheme which complies with the current edition of BS 5837: "Trees in relation to design, demolition and construction" that shall first have been submitted to, and approved in writing by, the Local Planning Authority. The agreed measures shall be kept in place during the entire course of development.
Reason: To safeguard trees which are visually important in accordance with Policies ENV1, DES1, and DES2 of the South Oxfordshire Local Plan 2035.
Related application(s):
P25/S3024/DISThe air source heat pumps hereby approved shall meet Microgeneration Installation Standard: MCS 020 to qualify as permitted development. If this MCS Certification cannot be met, the approved air source heat pumps shall be so installed, maintained, and operated so as to ensure that the rating noise level from the equipment does not exceed the background noise level at the boundary of the premises. Measurement and rating of noise for the purposes of this condition shall be in accordance with BS4142 (2014) 'Method for rating industrial and commercial sound'. The measurement location shall be 1 metre from the facade of the nearest noise sensitive receptor. In the event of unacceptable noise or vibration being caused by the installed plant, machinery and equipment, the persons responsible/owner shall investigate and undertake works to resolve the problem to the satisfaction of the local planning authority.
Reason: To protect the occupants of nearby residential properties from loss of amenity due to noise disturbance and in accordance with Policy ENV12 of the South Oxfordshire Local Plan 2035.
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any order revoking or re-enacting that Order), no window(s), door(s) or other openings other than those shown on the approved plan(s) shall be inserted in the side elevations of the development hereby permitted.
Reason: To ensure that the development is not unneighbourly in accordance with Policy DES6 of the South Oxfordshire Local Plan 2035.
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order revoking or re-enacting that Order), the enlargement, improvement or other alteration of any dwellinghouse as described in Schedule 2, Part 1, Class A of the Order shall not be undertaken without obtaining planning permission from the Local Planning Authority.
Reason: To safeguard the amenities of the occupiers of the adjoining properties and the character of the area in accordance with Policies DES1, DES2 and DES6 of the South Oxfordshire Local Plan 2035.
Prior to the occupation of any dwellings, a SUDS Compliance report prepared by an appropriately qualified Engineer must be submitted to and approved by the Local Planning Authority. This must suitably demonstrate that the sustainable drainage system has been installed and completed in accordance with the approved scheme (or detail any minor variations). This report should as a minimum cover the following;
1) Inclusion of as-built drawings in DWG or DXF format,
2) Inspection details of key SUDS features such as flow controls, storage features and
volumes and critical linking features or pipework undertaken, with appropriate photographs
and evidence of inspections incorporated,
3) Details of any remediation works required following the initial inspection,
4) Evidence that that remedial works have been completed.
5) CCTV survey.
Reason: To prevent pollution and flooding in accordance with Policies ENV12 and EP4 of the South Oxfordshire Local Plan 2035.
Prior to the commencement of development, with the exception of any demolition, a full surface water drainage scheme shall be submitted to, and approved in writing by, the Local Planning Authority. The design of the surface water drainage system shall be in accordance with the national standards for sustainable drainage systems, including details of BRE 365 soakage testing, levels, size, position and construction of all drainage works. The drainage scheme shall be sized to accommodate a minimum of the worst case 1 in 30 year storm, with evidence to demonstrate that the site can accommodate the worst case 1:100 year storm + 40% Climate Change storm, without any flows exiting up to this storm event and any storage on site not causing a nuisance or flooding to property. A surface water discharge to a Thames Water recorded foul sewer will not be permitted under any circumstance. The approved scheme shall be implemented in accordance with the approved details prior to the occupation of the development hereby approved.
Notes
The hydraulic model must be run in the FSR and latest FEH model, with the higher storage value used for design.
Cv values must be set at 0.95.
A 10% increase for urban creep must be provided.
An exceedance plan must be provided.
Each building must contain a bio retention and source control feature.
Full construction details of all surface water drainage components including hard standing areas, must be provided.
A coloured key highlighting responsibilities for the entire system must be provided.
Drainage layout from RWP must be provided.
Reason: To ensure the proper provision of surface water drainage and to ensure flooding is not exacerbated in the locality in accordance with Policy EP4 of the South Oxfordshire Local Plan 2035.
Prior to the occupation of any dwellings, a foul water drainage Compliance report prepared by an appropriately qualified Engineer must be submitted to and approved by the Local Planning Authority. This must suitably demonstrate that the foul water drainage system has been installed and completed in accordance with the approved scheme (or detail any minor variations). This report should as a minimum cover the following;
1) Inclusion of as-built drawings in DWG or DXF format,
2) Inspection details of key foul water drainage features such as the manhole chambers,
and critical linking features or pipework undertaken, with appropriate photographs
and evidence of inspections incorporated,
3) Details of any remediation works required following the initial inspection,
4) Evidence that that remedial works have been completed.
5) CCTV survey.
Reason: To ensure the proper provision of foul water drainage and to ensure flooding and pollution is not exacerbated in the locality in accordance with policy EP4 of the South Oxfordshire Local Plan 2035.
Prior to the commencement of development, with the exception of any demolition, a full foul water drainage scheme shall be submitted to and approved in writing by the Local Planning Authority. The drainage scheme shall include details of method, levels, size, position and construction of the drainage scheme.
Notes
Full construction details of all foul water drainage components must be provided.
A coloured key highlighting responsibilities for the entire system must be provided.
Drainage layout from SVP must be provided.
Reason: To ensure the proper provision of foul water drainage and to ensure flooding and pollution is not exacerbated in the locality in accordance with policy EP4 of the South Oxfordshire Local Plan 2035.
Prior to the first occupation of the development hereby approved, an Electric Vehicle Charging Point shall be installed for the new dwelling and thereafter retained as such.
Reason: To ensure sustainable forms of transport in accordance with Policies TRANS5, ENV12 and EP1 of the South Oxfordshire Local Plan 2035.
Prior to the commencement of development a detailed plan showing provision for two car parking spaces to be accommodated within the site, shall be submitted to and approved in writing by the Local Planning Authority and such parking facilities shall be laid out, surfaced, drained and completed to be compliant with sustainable drainage (SuDS) principles in strict accordance with the approved details prior to the first occupation of the development hereby permitted. Thereafter the car parking spaces shall be retained unobstructed except for the parking of vehicles associated with the development at all times.
Reason: In the interests of highway safety and to ensure the provision of off-street car parking in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
Related application(s):
P25/S3024/DISPrior to the construction of the development hereby approved above slab level, details of cycle parking facilities shall be submitted to and approved in writing by the Local Planning Authority. The cycle parking shall be implemented prior to first use of the development and thereafter retained in accordance with the approved details.
Reason: To encourage the use of cycles as a means of transport in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
Related application(s):
P25/S3024/DISPrior to the commencement of the development/development above slab levelhereby approved details of refuse and recycling storage shall be submitted to and approved in writing by the Local Planning Authority. The refuse and recycling storage shall be implemented in accordance with the approved details prior to the occupation of the development hereby approved and retained thereafter.
Reason: To ensure adequate provision for the management of waste in accordance with Policy EP3 of the South Oxfordshire Local Plan 2035.
Related application(s):
P25/S3024/DISPrior to the commencement of the development a phased risk assessment shall be carried out by a competent person in accordance with current government and Environment Agency Guidance and Approved Codes of Practice such as Land Contamination: Risk Management 2020 and BS10175:2011 +A2:2017 'Investigation of potentially contaminated sites'. Each phase shall be submitted to and approved in writing by the Local Planning Authority.
Phase 1 shall incorporate a desk study and site walk over to identify all potential contaminative uses on site, and to inform the conceptual site model. If potential contamination is identified in Phase 1 then a Phase 2 investigation shall be undertaken.
Phase 2 shall include a comprehensive intrusive investigation in order to characterise the type, nature and extent of contamination present, the risks to receptors and if significant contamination is identified to inform the remediation strategy.
Phase 3 requires that a remediation strategy be submitted to and approved by the LPA to ensure the site will be rendered suitable for its proposed use.
Reason: To ensure that any ground, water and associated gas contamination is identified and adequately addressed to ensure the safety of the development, the environment and to ensure the site is suitable for the proposed use in accordance with Policy ENV11 of the South Oxfordshire Local Plan 2035.
Related application(s):
P25/S3024/DISThe development shall not be occupied until any previously approved remediation strategy has been carried out in full and a validation report confirming completion of these works has been submitted to and approved in writing by the Local Planning Authority.
Reason: To ensure that any ground, water and associated gas contamination is identified and adequately addressed to ensure the safety of the development, the environment and to ensure the site is suitable for the proposed use in accordance with Policy ENV11 of the South Oxfordshire Local Plan 2035.
· It is an offence under Section 151 of the Highways Act 1980 for vehicles leaving the development site to carry mud onto the public highway. Facilities should therefore be provided and used on the development site for cleaning the wheels of vehicles before they leave the site.
· No vehicles associated with the building operations on the development site shall be parked on the public highway so as to cause an obstruction. Any such obstruction is an offence under Section 137 of the Highways Act 1980.