Planning Application Details

P25/S0313/S73Application Type: Section 73 (Show Map - opens in new window)
Status Bar
 
 Completed stage
 
 Current stage
 
 Next stage
Application registered
Consultation period
Application under consideration
Decision made
Description
Variation of condition 11 (Obscure glazing) on application P24/S1136/FUL - request for the obscure glazing windows to be side hung with 100mm restrictors. (Demolition of existing dwelling. Construction of 3-bed dwelling with associated landscaping).
Location
Lime Croft Limetree Road Goring RG8 9EY
Grid Reference
/
Applicant
Anne Parkinson
Lime Croft
Limetree Road
Goring
Reading
RG8 9EY
Agent
EllEll Architects
Unit 5F Canonbury Yard
190 New North Road
London
N1 7BJ
Constraints
Goring Conservation Area
Case Officer
Davina Sarac
Telephone: 01235 422600
Email: planning@southoxon.gov.uk
Consultation / Notification
No further Representations on this application will be accepted.

Consultations / Notifications to date are shown below.

Name / Number
Date Sent
Response Date
 
Goring on Thames Parish Council
c/o Sarah Edmunds
Gardiner Pavilion
Upper Red Cross Road
Goring
READING
RG8 9BD
05 02 2025
12 02 2025
 
The Cottage
Station Road
Goring
Reading
RG8 9HA
05 02 2025
 
Lime Croft
Limetree Road
Goring
Reading
RG8 9EY
05 02 2025
 
Lime Tree Cottage
Limetree Road
Goring
Reading
RG8 9EY
05 02 2025
 
Fryern
Station Road
Goring
Reading
RG8 9HA
05 02 2025
13 02 2025
 
Application Type
Minor (Section 73)
Application Progress
Date Received  
31st January 2025
Registration Date  
31st January 2025
Start Consultation Period  
5th February 2025
End Consultation Period  
26th February 2025
Target Decision Date  
28th March 2025
Decision
Planning Permission on 27th March 2025
Conditions / Refusal Reasons
The development to which this permission relates must be begun not later than 11 December 2027. Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004.

That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, ELL-063-A-06-300 B, ELL-063-A-06-301 B, ELL-063-A-06-101 B and ELL-063-A-06-100 B, and the by plans submitted under P24/S1136/FUL and listed in condition 2 of the decision notice which are not supersede by those listed here, except as controlled or modified by conditions of this permission. Reason: To secure the proper planning of the area in accordance with Development Plan policies.

Prior to the commencement of development, with the exception of any demolition, a full surface water drainage scheme shall be submitted to, and approved in writing by, the Local Planning Authority. The design of the surface water drainage system shall be in accordance with the non-statutory technical standards for sustainable drainage systems, including details of BRE 365 soakage testing, levels, size, position and construction of all drainage works. The drainage scheme shall be sized to accommodate a minimum of the worst case 1 in 30 year storm, with evidence to demonstrate that the site can accommodate the worst case 1:100 year storm + 40% Climate Change storm, without any flows exiting up to this storm event and any storage on site not causing a nuisance or flooding to property. A surface water discharge to a Thames Water recorded foul sewer will not be permitted under any circumstance. The approved scheme shall be implemented in accordance with the approved details prior to the occupation of the development hereby approved. Notes A solution feature has been identified to the east of the site and therefore, thorough consideration on the potential for subsidence issues occurring must be considered as part of any forthcoming application. Cv values must be set at 0.95. An exceedance plan must be provided. The building must contain a bio retention feature. This could be in the form of a rain water planter. Full construction details of all surface water drainage components including hard standing areas, must be provided. Drainage layout from RWP must be provided. A manhole schedule must be provided. Reason: To prevent pollution and flooding in accordance with Policies ENV12 and EP4 of the South Oxfordshire Local Plan 2035.

The submitted Construction Ecology Management Plan, The Landmark Practice dated January 2025, submitted and approved under the Discharge of Condition application reference P25/S0047/DIS shall be adhered to and implemented throughout the construction period strictly in accordance with the approved details. Reason: To avoid impacts on protected species and other ecological features during construction, in line with Policy ENV2 of the South Oxfordshire Local Plan 2035.

Prior to the commencement of the development above new slab level, details (including specification, position, height, orientation) of a scheme of biodiversity enhancements to be provided, shall be submitted to and approved in writing by the local planning authority. The scheme shall be designed in conjunction with a suitably qualified ecologist and bird/bat boxes on buildings shall be integrated into the fabric of the development. Features provided will be additional and separate to those required as mitigation measures under any protected species licence. A minimum number of biodiversity enhancement features shall be provided onsite as follows: one integrated bird nest box for house sparrow Passer domesticus or swift Apus apus, one integrated bat box, and one hedgehog fence tunnel within each length of close-boarded fencing or walling forming a plot boundary (arranged so that the plot each plot is connected to atleast two separate adjacent plots or to one other plot and open/public space as appropriate). Thereafter, the development shall be implemented in accordance with the approved details. All features shall be provided prior to first use and shall subsequently be maintained and retained. Reason: To secure biodiversity enhancements onsite, in accordance with Policy ENV2 of the South Oxfordshire Local Plan 2035 and paragraphs 180 and 186 of the NPPF .

No development above slab level shall take place until a photographic schedule of all materials to be used in the external construction and finishes of the development hereby permitted has been submitted to and approved in writing by the Local Planning Authority. Reason: In the interests of the visual appearance of the development in accordance with Policies DES1 and DES2 of the South Oxfordshire Local Plan 2035.

Prior to the construction of any development above slab level a scheme for the landscaping of the site, including the planting of live trees and shrubs, shall be submitted to and approved in writing by the Local Planning Authority. These details shall include schedules of new trees and shrubs to be planted (noting species, plant sizes and numbers/densities), the identification of the existing trees and shrubs on the site to be retained (noting species, location and spread), any earth moving operations and finished levels/contours, and an implementation programme. The scheme shall be implemented prior to the first occupation or use of the development hereby approved and thereafter be maintained in accordance with the approved scheme. In the event of any of the trees or shrubs so planted dying or being seriously damaged or destroyed within 5 years of the completion of the development, a new tree or shrub or equivalent number of trees or shrubs, as the case may be, of a species first approved by the Local Planning Authority, shall be planted and properly maintained in a position or positions first approved in writing by the Local Planning Authority. Reason: To help to assimilate the development into its surroundings in accordance with Policies ENV1, DES1 and DES2 of the South Oxfordshire Local Plan 2035.

No external lighting shall be installed on site unless and until a sensitive lighting strategy for bats is submitted to and approved in writing by the Local Planning Authority. The strategy shall: a) identify those areas/features on site that are likely to be both particularly sensitive for bats and vulnerable to disturbance from artificial lighting, including:known or potential breeding sites, resting places, foraging areas or important routes used to access key areas of their territory. b) show how and where external lighting will be installed (through provision of appropriate lighting plans, isolux contour maps and technical specifications) so that it can be clearly demonstrated that areas to be lit will not disturb or prevent bats using their territory or having access to their breeding sites or resting places. All external lighting shall be installed in accordance with the specifications and locations set out in the strategy. Under no circumstances should any other external lighting be installed without the prior consent from the local planning authority. Reason: to avoid impacts on bats from insensitive external lighting in line with Policy ENV2 of the South Oxfordshire Local Plan 2035.

Prior to the first occupation of the development hereby approved, an Electric Vehicle Charging Point shall be installed for each dwelling and thereafter retained as such. Reason: To ensure sustainable forms of transport in accordance with Policies TRANS5, ENV12 and EP1 of the South Oxfordshire Local Plan 2035.

Prior to first occupation, all carbon reduction energy efficiency measures shall be implemented in accordance with the Energy Statement hereby approved and a Verification Report shall be submitted to the Local Planning Authority and approved in writing. The Verification Report shall demonstrate (with photographic evidence) that the energy efficiency measures have been implemented. These measures shall be retained and maintained as such thereafter in accordance with the Energy Statement and Verification Report. Reason: To ensure high standards of sustainable design and construction in accordance with Policy DES10 of the South Oxfordshire Local Plan 2035.

The first floor windows in the north-west elevation and the first floor side window in the south-west elevation of the development hereby permitted shall be glazed in obscure glass with a minimum of level 3 obscurity, side hung with 100mm restrictor openings and shall remain as such in perpetuity, prior to the first occupation of the accommodation. Reason: To ensure that the development is not unneighbourly in accordance with Policy DES6 of the South Oxfordshire Local Plan 2035.

Prior to the first occupation of the development hereby approved, the parking and turning areas shall be provided in accordance with the approved plan ELL-063-A-06-100 REV B in application P24/S1136/FUL and shall be constructed, laid out, surfaced, drained and completed to be compliant with sustainable drainage (SuDS) principles, and shall be retained unobstructed except for the parking of vehicles associated with the development at all times. Reason: In the interests of highway safety and in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
Appeal
No appeal lodged.
Updates
These Planning Application Details were returned live from our back office database, and as such are as up to date as when the page was retrieved.