The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004.
That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, HRHB-SU-100 and HRHB-PL-100, except as controlled or modified by conditions of this permission.
Reason: To secure the proper planning of the area in accordance with Development Plan policies.
The exterior of the development hereby permitted shall only be constructed in the materials specified on the plans/supporting documents hereby approved or in materials which shall previously have been approved in writing by the Local Planning Authority.
Reason: In the interests of the visual appearance of the development in accordance with Policies DES1 and DES2 of the South Oxfordshire Local Plan 2035.
Prior to the commencement of development, a full surface water drainage scheme shall be submitted to, and approved in writing by, the Local Planning Authority. The design of the surface water drainage system shall be in accordance with the non-statutory technical standards for sustainable drainage systems, including details of BRE 365 soakage testing, levels, size, position and construction of all drainage works. The drainage scheme shall be sized to accommodate a minimum of the worst case 1 in 30 year storm. The approved scheme shall be implemented in accordance with the approved details prior to the occupation of the development hereby approved.
Notes:
Cv values must be set at 0.95.
An exceedance plan must be provided.
The building must contain a bio retention feature or source control feature. This could be in the form of a rain water planter or rain water butt.
Full construction details of all surface water drainage components, must be provided.
Drainage layout from RWP must be provided.
A manhole schedule must be provided.
Reason: To ensure the proper provision of surface water drainage and to ensure flooding is not exacerbated in the locality in accordance with Policy EP4 of the South Oxfordshire Local Plan 2035.
Related application(s):
P25/S1470/DISThe applicant, or their agents or successors in title, shall be responsible for organising and implementing an archaeological monitoring and recording action, to be maintained during the period of construction/during any groundworks taking place on the site. The archaeological monitoring and recording action shall be carried out by a professional archaeological organisation in accordance with a Written Scheme of Investigation that has first been approved in writing by the Local Planning Authority.
Reason: To safeguard the recording and inspection of matters of archaeological importance on the site in accordance with the NPPF (2024) and Policy ENV9 of the South Oxfordshire Local Plan 2035.
Related application(s):
P25/S1730/DISFollowing the approval of the Written Scheme of Investigation referred to in condition 5, no development shall commence on site without the appointed archaeologist being present. Once the archaeological monitoring and recording action has been completed its findings shall be reported to the Local Planning Authority, as agreed in the Written Scheme of Investigation, including all processing, research and analysis necessary to produce an accessible and useable archive and a full report for publication which shall be submitted to the Local Planning Authority within two years of the completion of the archaeological fieldwork.
Reason: To safeguard the identification, recording, analysis and archiving of heritage assets before they are lost and to advance understanding of the heritage assets in their wider context through publication and dissemination of the evidence in accordance with the NPPF (2024) and Policy ENV9 of the of the South Oxfordshire Local Plan 2035.