Conditions / Refusal Reasons
The development to which this permission relates must be begun no later than 15 August 2027.
Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004.
That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, C255.25, C225.21A, C225.20A, C225.01A and C225.22A, , except as controlled or modified by conditions of this permission.
Reason: To secure the proper planning of the area in accordance with Development Plan policies.
No development shall commence, except for demolition and site clearance until a full surface water drainage scheme has been submitted to, and approved in writing by, the Local Planning Authority. The design of the surface water drainage system shall be based on shallow infiltration above a depth of 1 metre below ground level throughout and shall be in accordance with the non-statutory technical standards for sustainable drainage systems, including details of BRE 365 soakage testing, levels, size, position and construction of all drainage works. The drainage scheme shall be sized to accommodate a minimum of the worst case 1 in 30 year storm, with evidence to demonstrate that the site can accommodate the worst case 1:100 year storm + 40% Climate Change storm, without any flows exiting up to this storm event and any storage on site not causing a nuisance or flooding to property. A surface water discharge to a Thames Water recorded foul sewer will not be permitted under any circumstance. The approved scheme shall be implemented in accordance with the approved details prior to the occupation of the development hereby approved.
Reason: To ensure the proper provision of surface water drainage and to ensure flooding is not exacerbated in the locality in accordance with policy EP4 of the South Oxfordshire Local Plan 2035.
The development shall accord with the approved arboricultural method statement and accompanying tree protection plan approved via condition discharge application P24/S2743/DIS. The approved arboricultural method statement and accompanying tree protection plan shall thereafter be implemented in accordance with the approved details prior to the commencement of any site works or operations, including demolition and site clearance.
Thereafter the development shall be carried out in accordance with the approved details with the agreed measures being kept in place during the entire course of development.
Reason: To safeguard trees which are visually important in accordance with Policies ENV1, DES1, and DES2 of the South Oxfordshire Local Plan 2035.
The exterior of the development hereby permitted shall only be constructed in the materials specified on the plans/supporting documents hereby approved or in materials which shall previously have been approved in writing by the Local Planning Authority.
Reason: In the interests of the visual appearance of the development in accordance with Policies DES1 and DES2 of the South Oxfordshire Local Plan 2035.