Planning Application Details

P24/S3364/FULApplication Type: Full Application (Show Map - opens in new window)
Status Bar
 
 Completed stage
 
 Current stage
 
 Next stage
Application registered
Consultation period
Application under consideration
Decision made
Description
Proposed demolition of existing bungalow and erection of self build replacement dwelling.
Location
1 Cromwell Close Henley-on-Thames RG9 1JJ
Grid Reference
475970/181676
Applicant
Mr & Mrs Clemo
1 Cromwell Close
Henley-on-Thames
RG9 1JJ
Agent
A'Bear & Ball Architects
Unit 4 Michaels Court
New House Farm
Hanney Road
Southmoor
OX13 5HR
Case Officer
Simon Kitson
Telephone: 01235 422600
Email: planning@southoxon.gov.uk
Consultation / Notification
No further Representations on this application will be accepted.

Consultations / Notifications to date are shown below. If the response has been scanned, you can access the document by clicking the folder icon alongside the relevant consultee. Folders with a
*
alongside them indicate new content within the folders (i.e. new documents added within the last 7 days)

Name / Number
Date Sent
Response Date
Scanned Response
 
Henley-on-Thames Town Council
c/o Sheridan Jacklin-Edward
Council Offices
Town Hall
Market Place
HENLEY-ON-THAMES
RG9 2AQ
06 11 2024
29 11 2024
 
6 Cromwell Road
Henley-On-Thames
RG9 1JH
06 11 2024
 
County Archaeological Services (SODC)
07 11 2024
08 11 2024
 
Drainage - (South&Vale)
06 11 2024
09 12 2024
 
Contaminated Land
06 12 2024
17 12 2024
 
7 Belle Vue Road
Henley-On-Thames
RG9 1JQ
06 11 2024
 
2 Cromwell Close
Henley-On-Thames
RG9 1JJ
06 11 2024
 
3 Belle Vue Road
Henley-On-Thames
RG9 1JQ
06 11 2024
 
12 Cromwell Road
Henley-On-Thames
RG9 1JH
06 11 2024
 
10 Cromwell Road
Henley-On-Thames
RG9 1JH
06 11 2024
 
3 Cromwell Close
Henley-On-Thames
RG9 1JJ
06 11 2024
 
5 Belle Vue Road
Henley-On-Thames
RG9 1JQ
06 11 2024
 
Application Type
Minor (Full Application)
Application Progress
Date Received  
21st October 2024
Registration Date  
1st November 2024
Start Consultation Period  
6th November 2024
End Consultation Period  
27th November 2024
Target Decision Date  
28th December 2024
Decision
Planning Permission on 20th December 2024
Conditions / Refusal Reasons
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission. Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004.

That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, SUMO 18904-02, SUMO 18904-01, L01, P01, P02, P03, P04, P05, P06, P07, P08 and P09, except as controlled or modified by conditions of this permission. Reason: To secure the proper planning of the area in accordance with Development Plan policies.

The exterior of the development hereby permitted shall only be constructed in the materials specified on the plans/supporting documents hereby approved or in materials which shall previously have been approved in writing by the Local Planning Authority. Reason: In the interests of the visual appearance of the development in accordance with Policies DES1 and DES2 of the South Oxfordshire Local Plan 2035.

Prior to any works of construction following the demolition of the existing bungalow, a full surface water drainage scheme shall be submitted to, and approved in writing by, the Local Planning Authority. The design of the surface water drainage system shall be in accordance with the non-statutory technical standards for sustainable drainage systems, including details of BRE 365 soakage testing, levels, size, position and construction of all drainage works. The drainage scheme shall be sized to accommodate a minimum of the worst case 1 in 30 year storm, with evidence to demonstrate that the site can accommodate the worst case 1:100 year storm + 40% Climate Change storm, without any flows exiting up to this storm event and any storage on site not causing a nuisance or flooding to property. The approved scheme shall be implemented in accordance with the approved details prior to the occupation of the development hereby approved. Notes -Cv values must be set at 0.95. - An exceedance plan must be provided. - The building must contain a bio retention/source control feature. This could be in the form of a rain water planter or rain water butt. - Full construction details of all surface water drainage components including hard standing areas, must be provided. - Drainage layout from RWP must be provided. - A manhole schedule must be provided. - The applicant must consider Ciria C574. Reason: To prevent pollution and flooding in accordance with Policies ENV12 and EP4 of the South Oxfordshire Local Plan 2035. Related application(s): P25/S1029/DIS

Prior to the commencement of the development above new slab level, details (including specification, position, height, orientation) of a scheme of biodiversity enhancements to be provided, shall be submitted to and approved in writing by the local planning authority. A minimum number of biodiversity enhancement features shall be provided onsite as follows: one integrated bird nest box for house sparrow Passer domesticus or swift Apus apus and one integrated bat box. Thereafter, the development shall be implemented in accordance with the approved details. All features shall be provided prior to first use and shall subsequently be maintained and retained. Reason: To secure biodiversity enhancements onsite, in accordance with Policy ENV2 and ENV3 of the South Oxfordshire Local Plan and paragraphs 187d and 193d of the National Planning Policy Framework. Related application(s): P25/S1029/DIS

Prior to first occupation, all carbon reduction energy efficiency measures shall be implemented in accordance with the Energy Statement hereby approved and a Verification Report shall be submitted to the Local Planning Authority and approved in writing. The Verification Report shall demonstrate (with photographic evidence) that the energy efficiency measures have been implemented. These measures shall be retained and maintained as such thereafter in accordance with the Energy Statement and Verification Report. Reason: To ensure high standards of sustainable design and construction in accordance with Policy DES10 of the South Oxfordshire Local Plan 2035.

Prior to the first occupation of the development hereby approved, the parking and turning areas shall be provided in accordance with the approved plan (P01) and shall be constructed, laid out, surfaced, drained and completed to be compliant with sustainable drainage (SuDS) principles, and shall be retained unobstructed except for the parking of vehicles associated with the development at all times. Reason: In the interests of highway safety and in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
Appeal
No appeal lodged.
Updates
These Planning Application Details were returned live from our back office database, and as such are as up to date as when the page was retrieved.