Conditions / Refusal Reasons
Development shall not commence within any phase or sub phase until details of the reserved matters, including access, siting, appearance, layout and scale, within that phase or sub phase have been submitted to and approved in writing by the Local Planning Authority.
In the case of the first phase, application for approval of the reserved matters for that phase must be made not later than the expiration of two years beginning with the date of outline planning permission P15/S2902/O (30 June 2017). Thereafter the development of the first phase or sub phase shall commence not later than the expiration of one year from the date of the approval of the first reserved matters.
In the case of reserved matter applications for approval on the remainder of the site, all applications must be made not later than the expiration of ten years from the date of the grant of the outline planning permission P15/S2902/O and development shall be begun not later than the expiration of two years from the approval of the last such matter to be approved.
Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by Section 51 of the Planning and Compulsory Purchase Act 2004.
That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans,
Outline:
Application Site Boundary Plan Drwg no CSa/1720/145 Rev F
Application Masterplan Drwg no CSa/1720/146_J
and the principles outlined in the following indicative plans:
Proposed Access Arrangements A4130/ Mersey Way roundabout Drwg no JNY4873-18/ Rev A
Possible Signal Controlled Layout A4130/Ladygrove Junction Drwg no JNY4873-23 Rev A
Proposed Access Arrangements A4130/ Avon Way Roundabout Drwg no JNY4873-33 Rev A
Proposed Site Access Arrangements from Ladygrove B4016 Drwg no JNY4873-19 Rev D
Potential Traffic Calming Features Ladygrove B4016 Drwg no JNY4873-32
Pedestrian and Cycle Improvements on A4130 Northern Perimeter Road Drwg no JNY4873-31
Reserved Matters:
Location Plan DES/012/100
Site Layout DES/012/101 Rev H
Elevation Materials Plan DES/012/102 Rev I
Surface Materials Plan DES/012/103 Rev H
Enclosure Plan DES/012/104 Rev I
Parking Strategy DES/012/105 Rev H
Refuse Tracking Strategy DES/012/106 Rev H
Lighting and Street Furniture Plan DES/012/107 Rev H
Lighting and Street Furniture Plan DES/012/108 rev B
Highways Plan DES/012/109 Rev H
Visibility Plan DES/012/110 Rev F
Masterplan DES/708/101 Rev B
Affordable Housing Plan DES/012/111 Rev G
Floor plans and elevations:
Plots 1-9 DES/012/200
Plots 1-9 DES/012/201
Plots 10-21 DES/012/202
Plots 10-21 DES/012/203
Plots 22-27 DES/012/204
Plots 28 & 78 DES/012/205 Rev A
Plot 29 DES/012/206
Plot 30 DES/012/207
Plots 31 & 108 DES/012/208
Plots 32-34 DES/012/209
Plots 35 & 36 DES/012/210 Rev A
Plots 37-40 DES/012/211
Plot 41 DES/012/212
Plots 42-45 & 74-77 DES/012/213
Plots 42-45 & 74-77 DES/012/214
Plots 46-48 & 71-73 DES/012/215
Plots 49-51 & 68-70 DES/012/216
Plots 52-55 & 64-67 DES/012/217
Plots 52-55 & 64-67 DES/012/218
Plot 56 DES/012/219 Rev A
Plots 57-58, 61-62, 79-80 & 83-84 DES/012/220
Plots 59-60 & 81-82 DES/012/221
Plots 63 & 85 DES/012/222
Plots 86-100 DES/012/223
Plots 86-100 DES/012/224
Plot 101 DES/012/225
Plot 102 &113 DES/012/226
Plot 103 DES/012/227
Plot 104 DES/012/228
Plots 105-106, 109-110, 111-112, 167-168 &172-173 DES/012/229
Plot 107 DES/012/230
Plots 114-128 DES/012/231
Plots 114-128 DES/012/232
Plots 129-130 DES/012/233
Plot 131 DES/012/234 Rev A
Plot 132 DES/012/235
Plots 133-134 DES/012/236 Rev A
Plot 135 DES/012/237
Plot 136 DES/012/238
Plot 137 DES/012/239
Plots 138-139 DES/012/240
Plot 140 DES/012/272 Rev 1
Plots 141-142 DES/012/242
Plots 143-144 DES/012/243 Rev A
Plots 145-146 & 165 166 DES/012/271 Rev 1
Plots 145-146 & 165-166 DES/012/270 Rev 1
Plot 147 DES/012/269 Rev 2
Plot 148 DES/012/268 Rev 3
Plots 149-151 DES/012/247
Plots 152-154 DES/012/248
Plots 155-156 DES/012/249
Plots 157-159 DES/012/250
Plots 160-162 DES/012/251
Plot 163 DES/012/268 Rev 3
Plot 164 DES/012/269 Rev 2
Plots 169-171 DES/012/254 Rev A
Garages & Carports DES/012/255
Garages & Carports DES/012/256
Garages & Carports DES/012/257
Garages & Carports DES/012/258
Garages & Carports DES/012/259
Garages & Carports DES/012/260
Bin & cycle stores DES/012/261
Bin & cycle stores DES/012/262
Street scenes DES/012/300 Rev A
Street scenes DES/012/301 Rev E
LEMP layout DES/012/500 Rev A
Planting Plan 1 of 6 DES/012/501 Rev B
Planting Plan 2 of 6 DES/012/502 Rev B
Planting Plan 3 of 6 DES/012/503 Rev B
Planting Plan 4 of 6 DES/012/504 Rev B
Planting Plan 5 of 6 DES/012/505 Rev E
Planting Plan 6 of 6 DES/012/506 Rev B
Services layout 708-SK14
Parcel F and G Drainage and Levels Strategy A085-CRO-001 P2
Parcel F and G Drainage Network Ref Plan A085-CRO-002 P1
708-110 - Infrastructure Plan Rev C
708-111 - Exceedance Flows
708-112 - Catchment Area Plan Rev A
708-220 - Highway Levels Strategy Rev A
708-230 - Long Sections - Sheet 1
708-231 - Long Sections - Sheet 2
708-120 S104 Layout
012-032 Drainage Layout Rev A
708-061 Adoptable Drainage Details
708-062 Permeable Paving Attenuation Detail
708-Didcot-Drainage and SuDS Maintenance Requirements Rev B
708-Drainage Strategy Note 708 21/09/2018
012-060 Private Drainage Details Rev A
012-Didcot - Private Drainage - Master Specification - Extract
708-Swale
SW Design Area A Rev A
SW Design Area B Rev A
FW Design
ACO StormBrixx Data Sheet
ACO StormBrixx Manual
ACO Q-Brake Vortex
Croudace - Catchment A A085 A
Croudace - Catchment B A085 A
Croudace - Catchment C A085 A
012 -001 Boundary Sections
Arboricultural Method Statement FLAC TPP 33-1021.02 Rev B
LEMP Phase 1 DES/012/600
Schedule of play equipment and street furniture DES/012/509
except as controlled or modified by conditions of this permission.
Reason: To secure the proper planning of the area in accordance with Development Plan policies.
Before any of the dwelling on Croudace Phase 1 are first occupied, the proposed vehicular accesses, driveways and turning areas that serve those dwellings shall be constructed, laid out, surfaced and drained in accordance with the specification details to be submitted to and approved in writing by the Local Planning Authority.
Reason: In the interests of highway safety and to ensure a satisfactory standard of construction and layout for the development, in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
Parking and turning areas for Croudace Phase 1 shall be provided in accordance with the submitted plan approved through condition 3 of this permission, and shall be constructed, laid out, surfaced, drained and completed to be compliant with sustainable drainage (SuDS) principles, and shall be retained unobstructed except for the parking of vehicles associated with the development at all times.
Reason: In the interests of highway safety and in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
The garage accommodation hereby approved for Plots 22-28, 43-54, 64-76, 103-107, 108-113, 132-135, 129-131, 144-146, 167-173, shall be retained as such and shall not be adapted for living purposes without planning permission from the Local Planning Authority.
Reason: In the interests of highway safety and to ensure the provision of adequate off-street car parking in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
Prior to first occupation of any dwelling on Croudace Phase 1, the East - West footway/cycleway (running along the southern boundary) including associated crossings and street furniture shall be provided in accordance with a plan that shall be submitted to and approved by the Local Planning Authority.
Reason: In the interests of accessibility and promoting sustainable travel in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2011.
Prior to first occupation of Croudace Phase 1, in addition to the private drainage layout plan received (drawing no. 012/032 Rev A) the remaining private drainage layout drawing to cover the whole of the Phase 1 site (the subject of this application) shall be submitted to the Local Planning Authority.
Reason: To ensure that the application is accompanied by a complete set of private drainage layout plans, in accordance with Policies ENV12 and EP4 of the South Oxfordshire Local Plan 2035.
The development shall be carried out in accordance with the principles of the Application Masterplan CSa/1720/146 J and comprise the following land use proportions:
(a) 54.5 ha residential accommodation
(b) 10.29 ha playing fields, pavilion, MUGA and tennis courts
(c) 8.47 ha formal public open space including local parks and playing areas
(d) 13.81 ha nature park
(d) 18.89 ha SUDs and green infrastructure corridors
(e) 1.49 ha allotments,
(f) 12.78 ha schools
(g) 2.35 ha neighbourhood centres
(h) 0.5 ha community centre site
(i) 0.5 ha extra care site
(j) 6.08 ha retained farmland
(k) 4.1 sports and leisure uses
(l) Infrastructure
No land use shall vary from the above stated area without the prior written approval of the Local Planning Authority. Each reserved matter application shall, where applicable, identify spatially and numerically the area of land in the above land use categories.
Reason: To ensure a balanced mix of uses in the development and to be in accordance with Policy H2 of the South Oxfordshire Core Strategy.
The following elements of development shall not be occupied until such time as the proposed modifications to the high pressure gas pipeline are completed and notified as such to the Health & Safety Executive and the Local Planning Authority:
· all housing within 165 metres of the pipeline
· sports centre pitches, play areas and allotments within 165 metres of the pipeline
· the secondary school
Reason: In the interests of health and safety in accordance with Policy EP2 of the adopted South Oxfordshire Local Plan 2035.
No development shall be occupied within any area affected by overhead electricity lines as shown on Drawing 708/SK0 until they are re-routed and the works completed and notified as such to the National Grid and the Local Planning Authority
Reason: In the interests of health and safety in accordance with Policy EP2 of the adopted South Oxfordshire Local Plan 2035.
There shall be no raising of ground within Flood Zone 2, 3A or 3B unless a detailed Flood Risk Assessment (FRA) has been submitted and approved in writing by the Local Planning Authority.
Reason: To ensure there is no increased risk of flooding to the proposed development and future users and to prevent flooding elsewhere by ensuring that compensatory storage of flood water can be provided in accordance with the National Planning Policy Framework.
No construction shall take place within Flood Zones 2 and 3A or 3B as detailed on Drawing No. CV280596/SK202 Rev D within the Flood Risk Assessment accompanying the planning application other than to provide for the following:
(a) any outdoor playing field or sports pitch;
(b) any road or parking area;
(c) any footpath or cycle path;
(d) any children's play equipment and hard surfaces;
(e) any gates, fences, walls or other means of enclosure;
(f) any works associated with the re-routing of the existing high pressure gas main
Reason: To reduce the risk of flooding to the proposed development and future users in accordance with the National Planning Policy Guidance Framework.
No construction works shall take place outside the hours of 07.30 to 18:30 Mondays to Fridays and 08:00 to 13:00 on Saturdays, and no works shall take place on Sundays or Public Holidays, unless it is for works that shall have first been approved in writing by the Local Planning Authority.
Reason: To protect the occupants of nearby residential properties from noise and dust disturbance during the development of the site in accordance with Policies ENV11 and ENV12 of the South Oxfordshire Local Plan 2035.
There shall be no works to, use by construction vehicles or storage of materials on or obstruction of any Public Right of Way (PROW) or access to any commercial or residential property from a PROW unless permitted specifically by works that shall have first been submitted for approval in writing by the Local Planning Authority.
Reason: To protect the rights of way in accordance with policy ENV5 of the South Oxfordshire Local Plan.
Residential development shall be constructed to Building Regulations Part M - M4 Category 2 in ten per cent of all open market homes and all affordable housing with entrances to the individual property from the ground floor. Details of the properties to be provided to Lifetime Homes Standards shall be shown on all reserved matter applications incorporating residential development.
Reason: To improve and increase the amount of housing stock that be used or adapted easily for use by people with disabilities in accordance with policy H11 of the South Oxfordshire Local Plan 2035
The development shall be implemented in accordance with the site wide Phasing Plan (Drg Nos. CB-12-132-902 Rev F, CB-12-132-906 Rev F, CB-12-132-907 Rev F, CB-12-132-908 Rev F, CB-12-132-909 Rev F) approved for outline planning permission P15/S2902/O or such updated version as shall be subsequently approved in writing by the Local Planning Authority.
Reason: To ensure that infrastructure is delivered to meet the needs of the development and to protect the amenity of the area in accordance with Policies CSDID3, CSQ4, CSI1 of the adopted Core Strategy Local Plan and Policies T1, D1 and D6 of the adopted Local Plan.
The development shall be implemented in accordance with the site wide masterplan and delivery strategy approved for outline planning permission P15/S2902/O through discharge of condition application P17/S3808/DIS.
Reason: To ensure that infrastructure is delivered to meet the needs of the development and to protect the amenity of the area in accordance with Policies H2, DES1, DES2, DES4 of the South Oxfordshire Local Plan 2035.
The development shall be implemented in accordance with the Housing Delivery Document (DH P18-2426 dated 29/08/19) approved for outline planning permission P15/S2902/O.
An updated Housing Delivery Document shall be provided for each phase or sub phase incorporating residential development and submitted with the reserved matters application. The Development shall be carried out in accordance with the approved Housing Delivery Document as updated and approved in writing by the Local Planning Authority.
Reason: To provide the housing mix on the site to meet housing need and facilitate a balanced community in accordance with the strategic housing market assessment (SHMA) and Policies H2, DES4 of the South Oxfordshire Local Plan 2035.
The Development shall be carried out in accordance with the Open Space and Community Facilities Document approved for outline planning permission P15/S2902/O (Drg No. CB_1_132-(10 Rev B) or such updated version as shall be subsequently approved in writing by the Local Planning Authority.
Reason: To ensure that provision of infrastructure is made to serve the needs of the development in accordance Policies H2, DES4, INF1 of the South Oxfordshire Local Plan 2035.
Each reserved matters application shall demonstrate how it accords with the North East Didcot Site Wide Design Code Rev K (June 2018) approved for outline planning permission P15/S2902/O.
Reason: To ensure that the design of the development accords with the NPPF, policies DES8, DES1, DES2, DES4, DES5, TRANS2, TRANS5 of the South Oxfordshire Local Plan 2035 and the adopted Joint Design Guide.
No development shall commence within key character areas as identified in the approved masterplan until a development brief for that character area and the immediate surrounding development has been submitted to and approved in writing by the Local Planning Authority. The development brief shall include design guidance for the character area building on the development principles in the approved Design Code (Condition 20). All reserved matters for development within key character areas shall accord with the principles in the approved Development Brief(s) unless otherwise approved in writing by the Local Planning Authority.
Reason: To ensure that the design of the development accords with the NPPF, policies DES8, DES1, DES2, DES4, DES5, TRANS2, TRANS5, of the South Oxfordshire Local Plan 2035 and the adopted Joint Design Guide.
No works or development shall commence within a phase or sub phase until a Construction Management Plan (CMP) has been submitted to and approved in writing by the Local Planning Authority for that phase or sub phase. The CMP shall comply with the approved CEMP Biodiversity and LEMS (Conditions 23 and 24) and Arboricultural Method Statement (Condition 33) and include the following matters:
(a) Traffic during construction: access, traffic routes, routes within site kept free from obstruction, hours on local highway network, wheel washing, travel plan for construction workers, location of compounds, vehicle parking and turning areas, scheme for prevention of surface water discharges onto the highway;
(b) Location of exclusion zones to prevent soil compaction for large scale planting areas, public and school playing fields, allotments and the remediation of any soil compaction;
(c) Handling and storage of topsoil;
(d) Protection of trees, hedgerows and water features identified in the LEMP and Condition 30 (Tree Protection)
(e) Archaeology protection;
(f) Environmental protection from noise, dust, vibration for residents within and adjoining the site;
(g) Contamination investigations and reporting;
(h) Method statement for the prevention of contamination or soil and groundwater and air pollution and remediation in the event of pollution;
(i) A management strategy and proposals for the minimisation of construction waste and sustainable working methods including the re-use of rainwater
The development shall be carried out in accordance with CMP or such updated version as shall be subsequently approved in writing by the Local Planning Authority.
Reason: To protect the amenity of the area and in the interests of highway safety in accordance with Policies ENV1, ENV11, ENV12, INF4, EP4, EP2, TRANS5 of the South Oxfordshire Local Plan 2035.
Prior to the commencement of each phase of the development (including demolition, ground works, vegetation clearance) a construction environmental management plan for that phase for Biodiversity (CEMP Biodiversity) shall be submitted to and approved in writing by the local planning authority. The CEMP (Biodiversity) shall where relevant include the following:
a) Up to date ecological surveys for bats, reptiles, water vole/otter, badger, nesting birds and habitats shall be undertaken (as appropriate). The up to date surveys shall be of an appropriate type for the above species and
survey methods shall follow national good practice guidelines.
b) Risk assessment of potentially damaging construction activities.
c) Identification of "biodiversity protection zones".
d) Practical measures (both physical measures and sensitive working practices) to avoid, reduce or mitigate the impacts on important habitats and protected species during construction (may be provided as a set of method statements).
e) The location and timing of sensitive works to avoid harm to biodiversity features.
f) The times during construction when specialist ecologists need to be present on site to oversee works and their roles and responsibilites.
g) Responsible persons and lines of communication.
h) Use of protective fences, exclusion barriers and warning signs.
The approved CEMP (Biodiversity) shall be adhered to and implemented throughout the construction period strictly in accordance with the approved details, unless otherwise agreed in writing by the Local Planning Authority.
Reason: To protect the important species on the site, in accordance with provisions of the NPPF and policies ENV2 and ENV3 of the South Oxfordshire Local Plan 2035.
A Landscape and Ecology Management Plan (LEMP) for each phase shall be submitted with Reserved Matters. Each LEMP shall be consistent with the details of the approved Strategic Landscape and Ecology Management Strategy (LEMS), approved for outline planning permission P15/S2902/O (CSA/1720/21 dated October 2017). No development shall commence within that phase until the LEMP for that phase has been approved in writing by the Local Planning Authority.
The content of the LEMP shall include the following:
a) Description and evaluation of features to be managed including the integration of existing and new planting
b) Ecological trends and constraints on site that might influence management
c) Proposals for ecological enhancements for habitats and species
d) Management plan for SUDs on the site
d) Aims and objectives of management
e) Appropriate management options for achieving aims and objectives
f) Prescriptions for management actions
g) Preparation of a work schedule (including an annual work plan capable of being rolled forward over a five-year period)
h) Details of the body or organisation responsible for implementation of the plan
i) Ongoing monitoring and remedial measures
The LEMP shall also include details of the legal and funding mechanism by which the long-term implementation of the plan will be secured by the developer with the management bodies responsible for its delivery. The plan shall also set out (where the results from monitoring show that conservation aims and objectives of the LEMP are not being met) how contingencies and/or remedial action will be identified, agreed and implemented so that the development still delivers the fully functioning biodiversity objectives of the originally approved scheme.
The development shall be implemented and maintained in accordance with the approved details.
Reason: To ensure that there is no net loss of biodiversity, to manage surface water and enhance the landscape in accordance with provisions of the NPPF and Policies ENV1 and ENV2 of the South Oxfordshire Local Plan 2035.
The development shall be implemented in accordance with the Archaeological Written Scheme of Investigation (October 2017) relating to the application site area, approved for outline planning permission P15/S2902/O through P17/S3808/DIS.
Reason: To safeguard the recording of archaeological matters within the site in accordance with the NPPF (2012) and Policy CSEN3 of the adopted Core Strategy.
Prior to any demolition on the site and the commencement of the development (other than in accordance with the agreed Written Scheme of Investigation), a staged programme of archaeological evaluation and mitigation shall be carried out by the commissioned archaeological organisation in accordance with the approved Written Scheme of Investigation. The programme of work shall include all processing, research and analysis necessary to produce an accessible and useable archive and a full report for publication which shall be submitted to the Local Planning Authority.
Reason: To safeguard the identification, recording, analysis and archiving of heritage assets before they are lost and to advance understanding of the heritage assets in their wider context through publication and dissemination of the evidence in accordance with the NPPF (2012) and Policy ENV6 of the South Oxfordshire Local Plan 2035.
A phased risk assessment shall be carried out by a competent person in accordance with current government and Environment Agency Guidance and Approved Codes of Practice. Each phase shall be submitted to and approved in writing by the Local Planning Authority.
Phase 1 shall include a comprehensive intrusive investigation in order to characterise the type, nature and extent of contamination present, the risks to receptors and if significant contamination is identified to inform the remediation strategy.
Phase 2 requires a remediation strategy for the identified contamination to ensure the site will be rendered suitable for its proposed use.
No development shall be occupied within a phase affected by contamination until any previously approved remediation strategy for that phase has been carried out in full and a validation report confirming completion of these works has been submitted to and approved in writing by the Local Planning Authority.
Reason: To ensure that any ground, water and associated gas contamination is identified and adequately addressed to ensure the safety of the development, the environment and to ensure the site is suitable for the proposed use in accordance with NPPF and Policy DES7 of the South Oxfordshire Local Plan 2035.
The development shall be implemented in accordance with the drainage strategy for foul and surface water approved for outline planning permission P15/S2902/O through P17/S3860/DIS.
Reason: To prevent pollution and flooding in accordance with Policies ENV12, IN4 and EP4 of the South Oxfordshire Local Plan 2035.
Prior to commencement of development within a phase or sub phase details of the foul and surface drainage works, and proposed ground levels within that phase or sub phase, shall be submitted with reserved matters for approval in writing by the Local Planning Authority. No dwelling or building shall be occupied or development used by the public until the foul and surface drainage works to serve that development have been carried out and completed in accordance with the approved details.
Reason: To prevent pollution in accordance with Policy ENV12 of the South Oxfordshire Local Plan 2035.
Prior to commencement of development within any phase that includes the crossing of Ladygrove Brook details of the design and proposed construction of that crossing shall be submitted for approval in writing by the Local Planning Authority.
Reason: To prevent pollution in accordance with Policy ENV12 of the South Oxfordshire Local Plan 2035.
The reserved matters applications within each phase shall include details of the proposed design and construction of the vehicular, cycle and pedestrian access and crossings. The development shall be constructed in accordance with the approved details.
Reason: In the interest of highway safety in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
No dwelling or facility shall be occupied until the roads, footpaths, vehicular, cycle and pedestrian accesses, driveways and turning areas that serve that dwelling or facility have been constructed, laid out, surfaced and drained in accordance with the details that shall have first been submitted with Reserved Matters and approved in writing by the Local Planning Authority.
Reason: In the interests of the amenity of residents, highway safety and to ensure a satisfactory standard of construction and layout for the development in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
Prior to the commencement of any site works or operations within a development phase, an arboricultural method statement to ensure the satisfactory protection of retained trees during the construction period shall be submitted with the Reserved Matters to the Local Planning Authority. Written approval must be obtained prior to commencement of any site works and the protection measures implemented in accordance with the approved details with the agreed measures being kept in place during the entire period of development, as specified in criteria (ii).
The matters to be encompassed within the arboricultural method statement shall where appropriate include the following:-
(i) A specification for the pruning of, or tree surgery to, trees to be retained in order to prevent accidental damage by construction activities;
(ii) The specification of the location, materials and means of construction of temporary protective fencing and/or ground protection in the vicinity of trees to be retained, in accordance with the recommendations of BS 5837 'Trees in relation to design, demolition and construction' and details of the timing and duration of its erection;
(iii) The definition of areas for the storage or stockpiling of materials, temporary on-site parking, site offices and huts, mixing of cement or concrete, and fuel storage;
(iv) The means of demolition of any existing site structures, and of the re-instatement of the area currently occupied thereby;
(v) The specification of the routing and means of installation of drainage or any underground services in the vicinity of retained trees;
(vi) The details and method of construction of any other structures such as boundary walls in the vicinity of retained trees and how these relate to existing ground levels;
(vii) The details of the materials and method of construction of any roadway, parking, pathway or other surfacing within the RPA, which is to be of a 'no dig' construction method in accordance with the principles of Arboricultural Practice Note 12 "Through the Trees to Development", and in accordance with current industry best practice; and as appropriate for the type of roadway required in relation to its usage.
(viii) Provision for the supervision of ANY works within the root protection areas of trees to be retained, and for the monitoring of continuing compliance with the protective measures specified, by an appropriately qualified arboricultural consultant, to be appointed at the developer's expense and notified to the Local Planning Authority, prior to the commencement of development; and provision for the regular reporting of continued compliance or any departure there from to the Local Planning Authority.
Reason: To safeguard trees which are visually important in accordance with Policies ENV1 and DES1 of the South Oxfordshire Local Plan 2035.
A scheme for the landscaping of each phase or sub phase shall be submitted with Reserved Matters for approval in writing Local Planning Authority. The landscaping scheme shall accord with the approved Design Code and LEMP and include:
(a) existing trees, hedgerows, orchard, grassland and other landscape features to be retained, restored or reinforced;
(b) schedules of proposed trees and plants, location, species, sizes, numbers and densities;
(c) root protection areas, details of construction methods in the vicinity of retained trees and details of pit design for tree planting within streets or areas of hard landscaping.
(d) existing and proposed levels comprising spot heights, gradients and contours, grading, ground modelling, and earth works;
(e) locations and details of street furniture in accordance with the Design Code
(f) existing and proposed services above and below ground;
(g) boundary treatments and means of enclosure with particulars of height, materials, brick bonds and fencing styles;
(h) surface materials
(i) location and design of SUDs features
(j) details of the bodies responsible for the long term management and their respective areas of responsibility to be identified on a plan
The scheme shall be implemented prior to the first occupation or use of development within that phase or sub phase and thereafter be maintained in accordance with the approved scheme. In the event of any of the trees or shrubs so planted dying or being seriously damaged or destroyed within 5 years of the completion of the development, a new tree or shrub or equivalent number of trees or shrubs, as the case may be, of a species first approved by the Local Planning Authority, shall be planted and properly maintained in a position or positions first approved in writing by the Local Planning Authority.
Reason: To help to assimilate the development into its surroundings, to manage surface water in accordance with the NPPF, Policies ENV1 and DES1 of the South Oxfordshire Local Plan 2035.
Concurrent with the submission of comprehensive details for the proposed landscape works for each Phase, a maintenance schedule and a long term management plan for the landscaping works and all trees shall be submitted to and approved in writing by the Local Planning Authority. The schedule and plan shall accord with the approved LEMP and the landscaping and tree planting shall be implemented and maintained in accordance with the agreed programme and details, unless otherwise agreed in writing by the Local Planning Authority.
Reason: To help to assimilate the development into its surroundings in accordance with Policies ENV1, DES1, DES7 of the South Oxfordshire Local Plan 2035.
The non residential buildings shall be designed and constructed to a standard that achieves the equivalent of BREEAM Very Good in energy, water and materials, unless otherwise agreed in writing by the Local Planning Authority. Details of the design shall be submitted with reserved matters for approval in writing by the Local Planning Authority.
Reason: To ensure high standards of sustainable design and construction in accordance with Policy DES8 of the South Oxfordshire Local Plan 2035.
All residential properties shall be offered the opportunity to have electric charging points provided during the construction period. In the following locations electric charging points (rapid) shall be provided as follows:
Neighbourhood Centre (4 charging points)
Community Centre (2 charging points)
Pavilion (2 charging points)
Details shall be submitted with the reserved matter applications for the above locations for approval in writing by the Local Planning Authority.
Reason: To encourage the use of electric vehicles in the interests of air quality in accordance with Policy ENV12 of the South Oxfordshire Local Plan 2035.
Details of the hours of operation for all non-residential buildings shall be submitted with reserved matter applications for approval in writing by the Local Planning Authority.
Reason: To protect the amenity of residential properties in accordance with Policy ENV12 of the South Oxfordshire Local Plan 2035.
The submission of Reserved Matters for non - residential buildings shall include a noise assessment together with a detailed scheme of mitigation for protecting occupants and surrounding residents from the internal and external noise. The scheme shall be approved in writing by the Local Planning Authority and the details shall be implemented in accordance with the approved scheme.
Reason: To protect the occupants of the development and residents from noise disturbance in accordance with Policy ENV12 of the South Oxfordshire Local Plan 2035.
The submission of Reserved Matters shall include details of lighting to be submitted for approval in writing by the Local Planning Authority. Details shall be submitted for the following and implemented in accordance with the approved details.
a) Details of lighting for non residential buildings and open space (e.g. Landscaped Areas, Green Corridors, Parks, Playing Fields) and measures to prevent light pollution
b) those areas/features on site that are particularly sensitive for bats and that are likely to cause disturbance in or around their breeding sites or resting places or along important routes used to access key areas of their territory, for example for foraging; and
c) for those areas sensitive to bats show how and where external lighting will be installed (through provision of appropriate lighting contour plans and technical specifications) so that it can be clearly demonstrated that areas to be lit will not disturb or prevent bats using their territory or having access to their breeding sites or resting places.
In respect of residential properties, external lighting shall be designed and installed so the main beam angle is not directed towards any potential observer and is not at an angle greater than 7- degrees from the vertical. This scheme shall also ensure that light trespass into the windows of any light sensitive premises shall not have a Vertical Illuminance greater than 5 Lux (in accordance with the Institution of Lighting Engineers Guidance Notes for the Reduction of Obtrusive Light GN01).
Reason: To safeguard the amenity of neighbouring residents, wildlife and the rural character of the countryside in accordance with Policies ENV1, ENV2 and ENV3 of the South Oxfordshire Local Plan 2035.
Prior to the construction of a bus stop details of the bus access, stopping and turning areas and the bus stop infrastructure including shelter, cycle parking and seating shall be submitted with reserved matters for approval in writing by the Local Planning Authority.
Reason: To encourage a sustainable form of travel in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
Cycle parking facilities accessible to the public shall be provided and distributed throughout the development and within the Neighbourhood Centre, Community Centre site, Leisure and Sports sites, all Play Areas and Allotments. The details shall accord with the Design Code and be submitted with Reserved Matters for approval in writing by the Local Planning Authority. The cycle parking facilities shall be implemented in accordance with the approved details prior to first use or occupation of the facility or properties they are to serve.
Reason: To encourage the use of cycles as a means of transport in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
All means of enclosure approved in the Reserved Matters shall be provided before first occupation of the dwellinghouse / building to which the means of enclosure relate.
Reason: To protect the amenity, privacy and security of the occupants in accordance with Policies DES1 and DES6 of the South Oxfordshire Local Plan 2035.
No development shall be occupied within the Neighbourhood centre or the Sports centre until a parking strategy for these areas has been submitted and approved in writing by the Local Planning Authority. The parking strategy shall detail parking controls and parking areas that shall aim to achieve the following:
a) Free or low cost short term parking for neighbourhood centre / sports centre users
b) Free parking spaces for disabled
c) Deter long term and commuter parking
d) Shared parking for different facilities in the neighbourhood centre
e) Define specific parking areas and controls for staff, deliveries and for residents and other specific users where it is agreed that it is not appropriate to apply the above controls
The parking areas shall be implemented and the parking controls shall be carried out in accordance with the approved parking strategy unless otherwise agreed in writing by the Local Planning Authority.
Reason: To ensure there is adequate parking for the neighbourhood centre and sports centre users, in accordance with Policy TRANS5 of the South Oxfordshire Local Plan