That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, 9095-2, 9095-3 and PL-04 4 except as controlled or modified by conditions of this permission.
Reason: To secure the proper planning of the area in accordance with Development Plan policies.
The exterior of the development hereby permitted shall only be constructed in the materials specified on the plans/supporting documents hereby approved or in materials which shall previously have been approved in writing by the Local Planning Authority.
Reason: In the interests of the visual appearance of the development in accordance with Policies DES1 and DES2 of the South Oxfordshire Local Plan 2035.
The cill level of the roof lights in the north elevation shall be at least 1.7 metres above the floor level of the associated rooms and shall be retained as such. No additional rooflights shall be inserted into the north elevation of the development hereby approved without planning permission from the Local Planning Authority.
Reason: To ensure that the development is not unneighbourly in accordance with Policy DES6 of the South Oxfordshire Local Plan 2035.
The landscaping scheme as approved by P23/S2805/DIS shall be implemented prior to the first occupation or use of the approved development and thereafter be maintained in accordance with the approved scheme. In the event of any of the soft landscaping so planted dying or being seriously damaged or destroyed within 5 years of the completion of the development, replacement planting, as the case may be, of a species first approved by the Local Planning Authority, shall be planted and properly maintained in a position or positions first approved in writing by the Local Planning Authority.
Reason: To help to assimilate the development into its surroundings in accordance with Policies ENV1, DES1 and DES2 of the South Oxfordshire Local Plan 2035.
Prior to first occupation of the development, a full surface water drainage scheme based on full infiltration unless evidenced exhausted, including details of the size, position and construction of drainage works, shall be submitted to, and approved in writing by, the Local Planning Authority. The drainage scheme shall be designed to accommodate a 1 in 100 year storm + 40% CC and shall be implemented in accordance with the approved details prior to the occupation of the development hereby approved.
Reason: To prevent pollution and flooding in accordance with Policies ENV12 and EP4 of the South Oxfordshire Local Plan 2035.
Related application(s):
P24/S2007/DIS,
P24/S3979/DIS,
P25/S0450/DISPrior to first occupation of the development, a full foul water drainage scheme shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall include details of the size, position and construction of the drainage scheme. Thereafter the scheme shall be implemented in accordance with the approved details prior to the occupation of the development hereby approved.
Reason: To ensure the proper provision of foul water drainage and to ensure flooding and pollution is not exacerbated in the locality in accordance with policy EP4 of the South Oxfordshire Local Plan 2035.
Related application(s):
P24/S2007/DIS,
P24/S3979/DIS,
P25/S0450/DISPrior to the first occupation of the development vision splays measuring 2.0 metres by 2.0 metres shall be provided to each side of the access and the vision splays shall not be obstructed by any object, structure, planting or other material with a height exceeding or growing above 0.6 metres as measured from carriageway level.
Reason: In the interest of highway safety in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
Prior to the first occupation of the development hereby approved, the parking and turning areas shall be provided in accordance with the approved plan PL-04 Rev 4 and shall be constructed, laid out, surfaced, drained and completed to be compliant with sustainable drainage (SuDS) principles, and shall be retained unobstructed except for the parking of vehicles associated with the development at all times.
Reason: In the interests of highway safety and in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
The development shall be implemented in accordance with the biodiversity enhancements approved under application P23/S2805/DIS with all features provided prior to first occupation and thereafter retained.
Reason: To secure the delivery of biodiversity enhancements on site, in accordance with Policies ENV2 and ENV3 of the South Oxfordshire Local Plan 2035.
Any external lighting will only be permitted in accordance with a lighting scheme to be first submitted to and approved in writing by the Local Planning Authority. The scheme shall be designed to an E3 Environmental Management Zone as defined by the Institute of Lighting Professional Guidance for the reduction of obtrusive light and details shall include:
a) Details of all the equipment uses, specific lamps, luminaries and columns with images.
b) For each luminaire a full technical specification (e.g. wattage, colour rating)
c) Isolux diagrams overlaid over the site and adjacent areas
d) Details of lighting operation hours
Any such lighting shall be implemented in accordance with the approved details and directed downwards to prevent nuisance to adjoining residential occupiers from light spillage.
Reason: To protect the appearance of the area, the environment and wildlife, and local residents from light pollution in accordance with Policies ENV1, ENV2, ENV3 and ENV12 of the South Oxfordshire Local Plan 2035.
Related application(s):
P24/S2007/DISNotwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order revoking or re-enacting that Order), the enlargement, improvement or other alteration of any dwellinghouse as described in Schedule 2, Part 1, Class A and Class B of the Order shall not be undertaken without obtaining planning permission from the Local Planning Authority.
Reason: To safeguard the amenities of the occupiers of the adjoining properties and the character of the area in accordance with Policies DES1, DES2 and DES6 of the South Oxfordshire Local Plan 2035.
Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order revoking or re-enacting that Order) the provision within the curtilage of the dwelling of any building, enclosure or swimming pool as described in Schedule 2, Part 1, Class E of the Order shall not be undertaken without obtaining planning permission from the Local Planning Authority.
Reason: To safeguard the amenities of the occupiers of the adjoining properties and the character of the area in accordance with Policies DES1, DES2 and DES6 of the South Oxfordshire Local Plan 2035.
Prior to the first use of the new access and parking area hereby approved the steps between Henley-on-Thames public footpath 6 and Makins Recreation Ground shall be implemented in accordance with details agreed by P23/S2805/DIS.
Reason: To maintain important public access through the site in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.