Planning Application Details

P24/S0481/S73Application Type: Section 73 (Show Map - opens in new window)
Status Bar
 
 Completed stage
 
 Current stage
 
 Next stage
Application registered
Consultation period
Application under consideration
Decision made
Description
Variation of condition 2 (Approved plans) and 24 (Energy Statement Verification) in application P22/S4155/FUL (Full planning permission for the erection of 21 dwellings with associated parking, landscaping and open space) - Provision of single storey rear extensions to plots 2-7 and 12-18, rationalisation of rear curtilage boundaries and replacement of garages for plots 13 and 14 with parking spaces/car ports.
Location
H & C Pearce & Sons Ltd Aylesbury Road Thame OX9 3AS
Grid Reference
/
Applicant
Rectory Homes Ltd
Rectory House
Thame Road
Haddenham
Buckinghamshire
HP17 8HU
Agent
Rectory Homes Ltd
Rectory House
Thame Road
Haddenham
Buckinghamshire
HP17 8HU
Constraints
Thame Conservation Area
Case Officer
Nicola Smith
Telephone: 01235 422600
Email: planning@southoxon.gov.uk
Consultation / Notification
No further Representations on this application will be accepted.

Consultations / Notifications to date are shown below.

Name / Number
Date Sent
Response Date
 
Thame Town Council
Mandy Sturdy
Town Hall
High Street
THAME
Oxon
OX9 3DP
14 02 2024
13 03 2024
 
Oxfordshire County Council - Single Response
15 02 2024
08 03 2024
 
23 Aylesbury Road
Thame
OX9 3AU
14 02 2024
 
Unit 1
H And C Pearce & Sons Ltd
Aylesbury Road
Thame
OX9 3AS
14 02 2024
 
Jasmine Cottage
Aylesbury Road
Thame
OX9 3AU
14 02 2024
 
Lashlake House
Aylesbury Road
Thame
OX9 3AU
14 02 2024
 
Unit 2
H And C Pearce & Sons Ltd
Aylesbury Road
Thame
OX9 3AS
14 02 2024
 
The Old Auction Room
Aylesbury Road
Thame
OX9 3AS
14 02 2024
 
21 Aylesbury Road
Thame
OX9 3AU
14 02 2024
 
25 Aylesbury Road
Thame
OX9 3AU
14 02 2024
 
H & C Pearce & Sons Ltd
Aylesbury Road
Thame
OX9 3AS
14 02 2024
 
Churchview House
Priest End
Thame
OX9 3AB
14 02 2024
 
Tec Glass
Aylesbury Road
Thame
OX9 3AU
14 02 2024
 
Application Type
Major (Section 73)
Application Progress
Date Received  
9th February 2024
Registration Date  
9th February 2024
Start Consultation Period  
14th February 2024
End Consultation Period  
14th March 2024
Target Decision Date  
10th May 2024
Decision
Planning Permission on 7th May 2024
Conditions / Refusal Reasons
The development to which this permission relates must be begun not later than 14 July 2026. Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004.

That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, except as controlled or modified by conditions of this permission. Location Plan 1031 PL 001 Block Plan Existing 1031 PL 010 Composite Existing Plan 1031 PL 025 Composite Existing Plan 1031 PL 030 Existing Plans and Elevations 1031 PL 021 Rev A Floor Plans and Elevations Existing 1031 PL 030 Floor Plans and Elevations Existing 1031 PL 025 rev A Proposed Block Plan J281_PL.100 Plot 1 Plans and Elevations1031 PL 128 B Plot 2 plans and elevations J.281_PL.102 Plots 3&4 plans and elevations J.281_PL.103 Plot 5 plans and elevations J.281_PL.104 Plots 6&7 plans and elevations J.281_PL.105 Plots 8-11 plans & elevations J.281_PL.106 Plots 12 &13 plans and elevations J.281_PL.107 Plots 14&15 plans and elevations J.281_PL.108 Plot 16 plans and elevations J.281_PL.109 Plot 17 Plans and elevations J.281_PL.110 Plot 18 plans and elevations J.281_PL.111 Floor Plans and Elevations Plots 19-21 1031 PL 129 Garage Plans and Elevations 1031 PL 140 A Site Sections J.281_PL.112 Proposals for Cycle Parking SK_230224_01 Landscaping Proposals AN.1243.210.P Rev B Structure Planting AN.1243.220.P Rev B Proposed Drainage Layout FCL/602/C/501 rev B Reason: To secure the proper planning of the area in accordance with Development Plan policies.

Prior to the commencement of development detailed plans showing the existing and proposed ground levels of the site together with the slab and ridge levels of the proposed development, relative to a fixed datum points on adjoining land outside of the application site, shall be submitted to and approved in writing by the Local Planning Authority. Thereafter the development shall be carried out in accordance with the approved details. Reason: In the interests of the visual appearance of the development in accordance with Policies DES1 and DES2 of the South Oxfordshire Local Plan 2035.

The materials to be used in the external construction and finishes of the development hereby permitted shall be in accordance with the details approved by way of application P24/S0687/DIS. Reason: In the interests of the visual appearance of the development in accordance with Policies DES1 and DES2 of the South Oxfordshire Local Plan 2035.

The cycle parking approved by way of application P23/S4112/DIS shall be implemented prior to first use of the development and thereafter retained in accordance with the approved details. Reason: To encourage the use of cycles as a means of transport in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

Condition discharged but retained to maintain numbering

The applicant, or their agents or successors in title, shall be responsible for organising and implementing an archaeological watching brief, to be maintained during the period of construction/during any groundworks taking place on the site. The watching brief shall be carried out by a professional archaeological organisation in accordance with the Written Scheme of Investigation that has been approved in writing by the Local Planning Authority by way of application P24/S0841/DIS . No development shall commence on site without the appointed archaeologist being present. Once the watching brief has been completed, its findings shall be reported to the Local Planning Authority, as agreed in the Written Scheme of Investigation, including all processing, research and analysis necessary to produce an accessible and useable archive and a full report for publication which shall be submitted to the Local Planning Authority within two years of the completion of the archaeological fieldwork. Reason: To enable an appropriate level of archaeological investigation of the area including excavation and recording, post excavation analysis and the publication of results in accordance with Policy ENV9 South Oxfordshire Local Plan 2035.

The development shall be carried out in accordance with the Arboricultural Method Statement approved by way of application P23/S3921/DIS with the agreed measures being kept in place during the entire course of development. Reason: To safeguard trees which are visually important in accordance with Policies ENV1, DES1, and DES2 of the South Oxfordshire Local Plan 2035.

The development shall be implemented in accordance with the details approved by way of application P23/S3811/DIS . All features shall be provided onsite as approved prior to final occupation. Reason: To secure biodiversity compensation and enchantments onsite, in accordance with Policies ENV2 and EVN3 of the SOLP, and paragraphs 174 and 180 of the NPPF.

The CTMP approved by way of condition P23/S3921/DIS shall be implemented prior to any works being carried out on site, and shall be maintained throughout the course of the development. Reason: In the interests of highway safety and to mitigate the impact of construction vehicles on the surrounding highway network, road infrastructure and local residents, particularly at morning and afternoon peak traffic times and in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

The Construction Method Statement, approved by way of condition P23/S3921/DIS shall be implemented prior to any works being carried out on site, and shall be maintained throughout the course of the development. The approved Statement shall be adhered to throughout the construction period. The development shall not be carried out otherwise than in accordance with the approved construction methods. Reason: To ensure that the development is not unneighbourly in accordance with Policy DES6 of the South Oxfordshire Local Plan 2035.

No development shall begin until a detailed sustainable drainage scheme, has been submitted to and approved in writing by the local planning authority. This shall be based on sustainable drainage principles and an assessment of the hydrological and hydrogeological context of the development. No building shall be occupied until the surface drainage works to serve that section of the development have been carried out and completed in accordance with the approved details. The scheme to be submitted shall include: · Drainage Catchment Plans and outline strategy for the entire development; · Details of the proposed flow control to reduce discharge to QBar (1.52 l/s) for all storms up to the worst case 1:100yr + 40% storm; · A compliance report to demonstrate how the scheme complies with the "Local Standards and Guidance for Surface Water Drainage on Major Development in Oxfordshire"; · Detailed hydraulic calculations including node references with consideration for the worst case 1:100 + 40% event based on using the latest FEH input data; · Fully detailed sustainable surface water drainage layouts; · Proposed site levels, floor levels and an exceedance plan with suitable measures incorporated to reduce the risk of surface water flooding; · Details of proposed measures to improve the water quality of surface water discharge based on local standard requirements. · SUDS features and sections; · Drainage Construction Details; · Maintenance and Management Plan covering all surface water drainage and SUDS features. Reason: To ensure the proper provision of surface water drainage and to ensure flooding is not exacerbated in the locality in accordance with Policy EP4 of the South Oxfordshire Local Plan 2035

No development shall begin until a detailed foul drainage scheme has been submitted to and approved in writing by the local planning authority. No building shall be occupied until the foul drainage works to serve that section of the development have been carried out and completed in accordance with the approved details. Reason: Reason: To prevent pollution and flooding in accordance with Policies ENV12 and EP4 of the South Oxfordshire Local Plan 2035.

Prior to the commencement of the development a remediation strategy be submitted to and approved by the LPA to ensure the site will be rendered suitable for its proposed use. Reason: To ensure that any ground, water and associated gas contamination is identified and adequately addressed to ensure the safety of the development, the environment and to ensure the site is suitable for the proposed use in accordance with Policy ENV11 of the South Oxfordshire Local Plan 2035.

Prior to the first occupation of the development the residents shared garden as identified on the approved plans shall be provided in accordance with a detailed layout and management plan which shall be submitted to and approved in writing by the Local Planning Authority prior to development above slab level, such details to include: a) Landscape treatment, details and age range of proposed play equipment, and any boundary treatment, street furniture including seats, bins etc. and proposed planting. b) Management responsibilities, maintenance schedules including safety inspections and replacement provisions. c) The stage at which the play area(s) shall be provided relative to the commencement of the development and the management and maintenance of the area for a minimum period of 20 years from its first provision. Reason: To meet the need for children's play space in accordance with Policy INF1 of the South Oxfordshire Local Plan 2035.

The refuse and recycling storage shall be implemented in accordance with the details approved by way of application P23/S3921/DIS prior to the occupation of the development hereby approved and retained thereafter. Reason: To ensure adequate provision for the management of waste in accordance with Policy EP3 of the South Oxfordshire Local Plan 2035.

Prior any development above slab level of the development hereby approved a scheme for the landscaping of the site, including the planting of live trees and shrubs, a scheme for the means of treatment of the hard surfaced areas and the provision of boundary treatment shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of the development hereby permitted. These details shall include schedules of new trees and shrubs to be planted (noting species, plant sizes and numbers/densities), the identification of the existing trees and shrubs on the site to be retained (noting species, location and spread), any earth moving operations and finished levels/contours, and an implementation programme. The scheme shall be implemented prior to the first occupation or use of development and thereafter be maintained in accordance with the approved scheme. In the event of any of the trees or shrubs so planted dying or being seriously damaged or destroyed within 5 years of the completion of the development, a new tree or shrub or equivalent number of trees or shrubs, as the case may be, of a species first approved by the Local Planning Authority, shall be planted and properly maintained in a position or positions first approved in writing by the Local Planning Authority. Reason: To help to assimilate the development into its surroundings in accordance with Policies ENV1, DES1 and DES2 of the South Oxfordshire Local Plan 2035.

Concurrent with the submission of comprehensive details of the proposed landscape works, a maintenance schedule and a long term management plan (for a minimum period of 20 years), for the soft landscaping works shall be submitted to and approved in writing by the Local Planning Authority. The Landscape Management Plan shall include: a) Details of long term design principles and objectives. b) Management responsibilities, maintenance schedules and replacement provisions for existing retained landscape features and any landscape to be implemented as part of the approved landscape scheme including hard surfaces, street furniture within open spaces and any play/ youth provision. c) A plan detailing which areas of the site the Landscape Management Plan covers and also who is responsible of the maintenance of the other areas of the site. d) Summary plan detailing different management procedures for the types of landscape on site e.g. Wildflower meadows, native or ornamental hedgerows. The schedule and plan shall be implemented in accordance with the agreed programme. Reason: To help to assimilate the development into its surroundings in accordance with Policies ENV1, DES1 and DES2 of the South Oxfordshire Local Plan 2035.

Prior to the first occupation of the development hereby approved, the parking and turning areas shall be provided in accordance with the approved plan and shall be constructed, laid out, surfaced, drained and completed to be compliant with sustainable drainage (SuDS) principles, and shall be retained unobstructed except for the parking of vehicles associated with the development at all times. Reason: In the interests of highway safety and in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035

Prior to the first occupation of the development hereby approved the proposed means of access shall be formed and laid out and constructed strictly in accordance with the local highway authority's specifications and all ancillary works specified shall be undertaken. Reason: In the interest of highway safety in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

Prior to the commencement of development hereby permitted, details of the tree species and the tree pits shall be submitted to and approved in writing by the Local Planning Authority. all trees to be planted within hard surface areas shall be planted into site specific tree pits. The tree pits are to be a crated pit design that incorporates technology that will enable tree/s to successfully grow in hard surface environments. The pits must provide the significant quantities of growing medium required to allow the trees to become established and grow on to maturity, sustaining the trees in a healthy condition and allow for ease of maintenance. Reason: To help to assimilate the development into its surroundings in accordance with Policies ENV1, DES1 and DES2 of the South Oxfordshire Local Plan 2035.

Prior to the first occupation of any dwelling hereby permitted, a SUDS Compliance report prepared by an appropriately qualified Engineer must be submitted to and approved by the Local Planning Authority. This must suitably demonstrate that the sustainable drainage system has been installed and completed in accordance with the approved scheme (or detail any minor variations). This report should as a minimum cover the following; 1) Inclusion of as-built drawings in dwg and pdf format, 2) Inspection details of key SUDS features such as flow controls, storage features and volumes and critical linking features or pipework undertaken, with appropriate photographs and evidence of inspections incorporated, 3) Details of any remediation works required following the initial inspection, 4) Evidence that that remedial works have been completed. 5) Confirm details of any management company set up to maintain the system. Reason: To ensure the proper provision of surface water drainage and to ensure flooding is not exacerbated in the locality in accordance with Policy EP4 of the South Oxfordshire Local Plan 2035

The development shall not be occupied until any previously approved remediation strategy has been carried out in full and a validation report confirming completion of these works has been submitted to and approved in writing by the Local Planning Authority. Reason: To ensure that any ground, water and associated gas contamination is identified and adequately addressed to ensure the safety of the development, the environment and to ensure the site is suitable for the proposed use in accordance with Policy ENV11 of the South Oxfordshire Local Plan 2035.

Prior to first occupation, all carbon reduction energy efficiency measures shall be implemented in accordance with the Sustainability and Energy Statement (January 2024) hereby approved and a Verification Report shall be submitted to the Local Planning Authority and approved in writing. The Verification Report shall demonstrate (with photographic evidence) that the energy efficiency measures have been implemented. These measures shall be retained and maintained as such thereafter in accordance with the Energy Statement and Verification Report. Reason: To ensure high standards of sustainable design and construction in accordance with Policy DES10 of the South Oxfordshire Local Plan 2035.

Prior to the first occupation of any dwelling hereby approved, a scheme to provide each dwelling with Electric Vehicle Charging Points shall be submitted to and approved in writing by the Local Planning Authority. Thereafter each Electric Vehicle Charging Point shall be implemented prior to the occupation of the dwelling it would serve. Reason: To ensure sustainable forms of transport in accordance with Policies TRANS5, ENV12 and EP1 of the South Oxfordshire Local Plan 2035.

The second floor window in the eastern elevation of plot 2 hereby permitted shall be glazed in obscure glass with a minimum of level 3 obscurity, prior to the first occupation of the accommodation and it shall be retained as such thereafter. Reason: To ensure that the development is not unneighbourly in accordance with Policy DES6 of the South Oxfordshire Local Plan 2035.

Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 2015 (or any Order revoking or re-enacting that Order), the enlargement, improvement or other alteration of plots 1, 19, 20 or 21 as described in Schedule 2, Part 1, Class A of the Order shall not be undertaken without obtaining planning permission from the Local Planning Authority. Reason: To safeguard the character of the area in accordance with Policies DES1 and ENV6 of the South Oxfordshire Local Plan 2035.

No work shall take place at the premises except between the hours of 8am and 6pm on Mondays to Fridays and 8am to 1pm on Saturdays. No work shall be undertaken on Sundays and Public Holidays. Reason: To ensure that the development is not unneighbourly in accordance with Policy DES6 of the South Oxfordshire Local Plan 2035.

The development hereby approved shall be implemented in accordance with Chapter 6.4 of the supporting Ecological Impact Assessment (LUS Ecology, 03/11/2022). Reason: To minimise the ecological impacts of development, in accordance with Policy ENV2 of the SOLP, and paragraphs 174 and 180 of the NPPF.

The developer shall confirm in writing to the Local Planning Authority the presence of any unsuspected contamination encountered during the development. In the event of any contamination to the land and/or water being encountered, no development shall continue until a programme of investigation and/or remedial works to include methods of monitoring and certification of such works undertaken. Where land contamination investigation/remedial works are required this must be carried out by a competent person in accordance with current government and Environment Agency Guidance and Approved Codes of Practice such as Land Contamination: Risk Management 2020 and BS10175:2011 +A2:2017 'Investigation of potentially contaminated sites' and submitted to and approved in writing by the local planning authority. Reason: To ensure that any ground, water and associated gas contamination is identified and adequately addressed to ensure the safety of the development, the environment and to ensure the site is suitable for the proposed use in accordance with Policy ENV11 of the South Oxfordshire Local Plan 2035.

The visibility splays shown on the approved plan (dwg. 502.0156-0007) shall not be obstructed by any object, structure, planting or other material with a height exceeding or growing above 0.8 metres as measured from carriageway level. Reason: In the interest of highway safety in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.
Appeal
No appeal lodged.