Planning Application Details

P22/S2056/FULApplication Type: Full Application (Show Map - opens in new window)
Status Bar
 
 Completed stage
 
 Current stage
 
 Next stage
Application registered
Consultation period
Application under consideration
Decision made
Description
Erection of a pair of semi-detached dwellings following the demolition of the existing detached bungalow.
Location
43 Mill Lane Benson OX10 6SA
Grid Reference
/
Applicant
Ms L Verran
43 Mill Lane
Benson
Wallingford
Oxfordshire
OX10 6SA
Agent
Partners In Planning and Architecture
Suite 2 Clare Hall
St Ives Business Park
Parsons Green
St Ives
PE27 4WY
Case Officer
Kim Gould
Telephone: 01235 422600
Email: planning@southoxon.gov.uk
Consultation / Notification
No further Representations on this application will be accepted.

Consultations / Notifications to date are shown below.

Name / Number
Date Sent
Response Date
 
Benson Parish Council
c/o The Clerk
Benson Parish Hall
Sunnyside
Benson
OX10 6LZ
07 06 2022
16 06 2022
 
County Archaeological Services (SODC)
07 06 2022
07 06 2022
 
Contaminated Land
06 06 2022
15 06 2022
 
Countryside Access
07 06 2022
 
26 The Moorlands
Benson
Wallingford
OX10 6RT
06 06 2022
 
22 The Moorlands
Benson
Wallingford
OX10 6RT
06 06 2022
 
24 The Moorlands
Benson
Wallingford
OX10 6RT
06 06 2022
 
41 Mill Lane
Benson
Wallingford
OX10 6SA
06 06 2022
 
Oakwood
7A St Helens Crescent
Benson
Wallingford
OX10 6RX
06 06 2022
24 06 2022
 
26 Mill Lane
Benson
Wallingford
OX10 6SA
07 06 2022
 
32 Mill Lane
Benson
Wallingford
OX10 6SA
07 06 2022
 
Rivendell
30 Mill Lane
Benson
Wallingford
OX10 6SA
07 06 2022
 
28 Mill Lane
Benson
Wallingford
OX10 6SA
07 06 2022
20 06 2022
 
Energy Assessor (ESE Ltd)
19 07 2022
03 08 2022
 
South -Highways Liaison Officer (Oxfordshire County Council)
20 07 2022
02 08 2022
 
Drainage - (South&Vale)
05 08 2022
17 08 2022
 
Application Type
Minor (Full Application)
Application Progress
Date Received  
30th May 2022
Registration Date  
30th May 2022
Start Consultation Period  
6th June 2022
End Consultation Period  
27th June 2022
Target Decision Date  
24th August 2022
Decision
Planning Permission on 23rd August 2022
Conditions / Refusal Reasons
The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission. Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004.

That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, ASC 21 880A, 01 Rev B and 2022 05 101 Rev A, except as controlled or modified by conditions of this permission. Reason: To secure the proper planning of the area in accordance with Development Plan policies.

No development above slab level shall take place until a photographic schedule of all materials to be used in the external construction and finishes of the development hereby permitted has been submitted to and approved in writing by the Local Planning Authority. Reason: In the interests of the visual appearance of the development in accordance with Policies DES1 and DES2 of the South Oxfordshire Local Plan 2035. Related application(s): P23/S1490/DIS

Prior to the commencement of the development a phased risk assessment shall be carried out by a competent person in accordance with current government and Environment Agency Guidance and Approved Codes of Practice such as Land Contamination: Risk Management 2020 and BS10175:2011 +A2:2017 'Investigation of potentially contaminated sites'. Each phase shall be submitted to and approved in writing by the Local Planning Authority. Phase 1 shall incorporate a desk study and site walk over to identify all potential contaminative uses on site, and to inform the conceptual site model. If potential contamination is identified in Phase 1 then a Phase 2 investigation shall be undertaken. Phase 2 shall include a comprehensive intrusive investigation in order to characterise the type, nature and extent of contamination present, the risks to receptors and if significant contamination is identified to inform the remediation strategy. Phase 3 requires that a remediation strategy be submitted to and approved by the LPA to ensure the site will be rendered suitable for its proposed use. Reason: To ensure that any ground, water and associated gas contamination is identified and adequately addressed to ensure the safety of the development, the environment and to ensure the site is suitable for the proposed use in accordance with Policy ENV11 of the South Oxfordshire Local Plan 2035. Related application(s): P23/S1490/DIS

The developer shall confirm in writing to the Local Planning Authority the presence of any unsuspected contamination encountered during the development. In the event of any contamination to the land and/or water being encountered, no development shall continue until a programme of investigation and/or remedial works to include methods of monitoring and certification of such works undertaken. Where land contamination investigation/remedial works are required this must be carried out by a competent person in accordance with current government and Environment Agency Guidance and Approved Codes of Practice such as Land Contamination: Risk Management 2020 and BS10175:2011 +A2:2017 'Investigation of potentially contaminated sites' and submitted to and approved in writing by the local planning authority. Reason: To ensure that any ground, water and associated gas contamination is identified and adequately addressed to ensure the safety of the development, the environment and to ensure the site is suitable for the proposed use in accordance with Policy ENV11 of the South Oxfordshire Local Plan 2035.

The development shall not be occupied until any previously approved remediation strategy has been carried out in full and a validation report confirming completion of these works has been submitted to and approved in writing by the Local Planning Authority. Reason: To ensure that any ground, water and associated gas contamination is identified and adequately addressed to ensure the safety of the development, the environment and to ensure the site is suitable for the proposed use in accordance with Policy ENV11 of the South Oxfordshire Local Plan 2035.

The first floor bathroom windows in the east and west elevations of the development hereby permitted shall be glazed in obscure glass with a minimum of level 3 obscurity, and shall be fixed shut with the exception of a top hung openable fanlight (or other means of opening to be first agreed in writing by the Local Planning Authority) prior to the first occupation of the accommodation and it shall be retained as such thereafter. Reason: To ensure that the development is not unneighbourly in accordance with Policy DES6 of the South Oxfordshire Local Plan 2035.

Prior to the first occupation of the development hereby approved, the parking and turning areas shall be provided in accordance with the approved plan 2022.05.101, Rev A and shall be constructed, laid out, surfaced, drained and completed to be compliant with sustainable drainage (SuDS) principles, and shall be retained unobstructed except for the parking of vehicles associated with the development at all times. Reason: In the interests of highway safety and in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

Prior to first occupation, all carbon reduction energy efficiency measures shall be implemented in accordance with the Energy Statement hereby approved and a Verification Report shall be submitted to the Local Planning Authority and approved in writing. The Verification Report shall demonstrate (with photographic evidence) that the energy efficiency measures have been implemented. These measures shall be retained and maintained as such thereafter in accordance with the Energy Statement and Verification Report. Reason: To ensure high standards of sustainable design and construction in accordance with Policy DES10 of the South Oxfordshire Local Plan 2035.

Prior to the first occupation of the development hereby approved, an Electric Vehicle Charging Point shall be installed for each dwelling and thereafter retained as such. Reason: To ensure sustainable forms of transport in accordance with Policy TRANS5 of the South Oxfordshire Local Plan 2035.

Prior to the commencement of development, with the exception of any demolition, a full surface water drainage scheme in accordance with the surface water drainage hierarchy as set out in Part H of the Building Regulations, including details of the size, position and construction of drainage works, shall be submitted to, and approved in writing by, the Local Planning Authority. The drainage scheme shall be designed to accommodate a 1 in 100 year storm + 40% CC and shall be implemented in accordance with the approved details prior to the occupation of the development hereby approved. Reason: To ensure the proper provision of surface water drainage and to ensure flooding is not exacerbated in the locality in accordance with Policy EP4 of the South Oxfordshire Local Plan 2035. Related application(s): P23/S1490/DIS
Appeal
No appeal lodged.
Updates
These Planning Application Details were returned live from our back office database, and as such are as up to date as when the page was retrieved.