Planning Application Details

P21/S4044/LBApplication Type: Listed Bldg. Consent (Show Map - opens in new window)
Status Bar
 
 Completed stage
 
 Current stage
 
 Next stage
Application registered
Consultation period
Application under consideration
Decision made
Description
Install an Air Source Heat Pump system to replace the current oil-fired central heating system to be situated outdoors in the property's grounds, and a boiler/buffer unit to replace the existing oil-fired boiler in the downstairs utility room. The proposal includes the replacement of radiators and modification to connection from boiler/buffer to existing hot water tank. (As amended by plans received 2021-10-18 to include location of internal boiler)
Location
New Inn Farm Beckley OX3 9TY
Grid Reference
456626/210066
Applicant
 Joshua Dubin
New Inn Farm
Beckley
Oxford
OX3 9TY
Agent
Joshua Dubin
New Inn Farm
Beckley
Oxford
OX3 9TY
Constraints
Grade II Listed Building
Case Officer
Max Gull
Telephone: 01235 422600
Email: planning@southoxon.gov.uk
Consultation / Notification
comment on application button

Representations on this application should be made in writing, ideally by using the web-form which can be accessed via this link (please note this form will open in a new window) no later than 4th November 2021

Consultations / Notifications to date are shown below. If the response has been scanned, you can access the document by clicking the folder icon alongside the relevant consultee. Folders with a
*
alongside them indicate new content within the folders (i.e. new documents added within the last 7 days)

Name / Number
Date Sent
Response Date
Scanned Response
 
Beckley Parish Council
c/o Mrs S Cox
Stowood House
Common Road
Beckley
Oxford
OX3 9UR
06 10 2021
05 11 2021
 
Conservation Officer (South and Vale)
06 10 2021
09 11 2021
 
Application Type
Other (Listed Bldg. Consent)
Application Progress
Date Received  
21st September 2021
Registration Date  
4th October 2021
Start Consultation Period  
5th October 2021
End Consultation Period  
4th November 2021
Target Decision Date  
29th November 2021
Decision
No decision Issued
Appeal
No appeal lodged.
Updates
These Planning Application Details were returned live from our back office database, and as such are as up to date as when the page was retrieved.