The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004.
That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, 156 5c, 156 6a, 156 4a, 156 3 and 2986, except as controlled or modified by conditions of this permission.
Reason: To secure the proper planning of the area in accordance with Development Plan policies.
Except in the case of any building work hereby permitted, no change in the levels of the land shall take place unless in accordance with a detailed scheme which shall have been submitted to and approved in writing by the Local Planning Authority before any development commences on site. The scheme shall include details of existing and proposed ground levels.
Reason: To ensure a satisfactory form of development in accordance with Policy CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2, D1 and H4 of the South Oxfordshire Local Plan 2011.
Prior to any construction of the development hereby approved above foundation level, a photographic schedule of all materials to be used in the external construction and finishes of the development hereby permitted shall be submitted to and approved in writing by the Local Planning Authority.
Reason: In the interests of the visual appearance of the development in accordance with Policy CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2, D1 and H4 of the South Oxfordshire Local Plan 2011.
Related application(s):
P22/S0515/DIS,
P22/S3604/DIS,
P23/S3301/DISNotwithstanding the provisions of the Town and Country (General Permitted Development Order) 2015 (or any Order revoking or re-enacting that Order), no development as specified in Schedule 2, Part 1, Class A - Extensions; Class B - Roof Extensions; Class E - Outbuildings shall be undertaken for Unit 5 without obtaining planning permission from the Local Planning Authority.
Reason: The specific circumstances of this site warrant the Local Planning Authority having control over any further development as specified in the condition in the interests of amenity and in accordance with Policy CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2, D1, D4 and H4 of the South Oxfordshire Local Plan 2011.
Prior to the first occupation of the development hereby approved, the parking and turning areas shall be provided in accordance with the approved plan 156-5C and shall be constructed, laid out, surfaced, drained and completed to be compliant with sustainable drainage (SuDS) principles, and shall be retained unobstructed except for the parking of vehicles associated with the development at all times. Vehicular access shall only be taken directly from Farm Road and no Vehicular access shall be taken directly from Reading Road.
Reason: In the interests of highway safety and in accordance with Policies G2, D2, H4, T1 and T2 of the South Oxfordshire Local Plan 2011.
Cycle parking facilities shall be provided prior to the occupation of the development hereby approved in accordance with the details shown on drawing 156-5C. Thereafter, the cycle parking shall be retained as approved.
Reason: To encourage the use of cycles as a means of transport in accordance with Policies G2, H4 and T2 of the South Oxfordshire Local Plan 2011.
A Construction Traffic Management Plan (CTMP) shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of development. The approved CTMP shall be implemented prior to any works being carried out on site, and shall be maintained throughout the course of the development.
Reason: In the interests of highway safety and to mitigate the impact of construction vehicles on the surrounding highway network, road infrastructure and local residents, particularly at morning and afternoon peak traffic times and in accordance with Policies G2, H4 and T1 of the South Oxfordshire Local Plan 2011.
Related application(s):
P22/S0515/DIS,
P22/S3604/DIS,
P23/S3301/DISPrior to any construction of the development hereby approved above foundation level, a scheme for the landscaping of the site, including the planting of live trees and shrubs and the provision of boundary treatment shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall be implemented prior to the first occupation or use of development and thereafter be maintained in accordance with the approved scheme. In the event of any of the trees or shrubs so planted dying or being seriously damaged or destroyed within 5 years of the completion of the development, a new tree or shrub or equivalent number of trees or shrubs, as the case may be, of a species first approved by the Local Planning Authority, shall be planted and properly maintained in a position or positions first approved in writing by the Local Planning Authority.
Reason: To help to assimilate the development into its surroundings in accordance with Policies CSEN1 and CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2, C9, D1, D4 and H4 of the South Oxfordshire Local Plan 2011.
Related application(s):
P22/S0515/DIS,
P22/S3604/DIS,
P23/S3301/DISPrior to the commencement of the development a phased risk assessment shall be carried out by a competent person in accordance with current government and Environment Agency Guidance and Approved Codes of Practice such as CLR11 Model Procedures for the Management of Land Contamination and BS10175 Investigation of potentially contaminated sites. Each phase shall be submitted to and approved in writing by the Local Planning Authority.
Phase 1 shall incorporate a desk study and site walk over to identify all potential contaminative uses on site, and to inform the conceptual site model. If potential contamination is identified in Phase 1 then a Phase 2 investigation shall be undertaken.
Phase 2 shall include a comprehensive intrusive investigation in order to characterise the type, nature and extent of contamination present, the risks to receptors and if significant contamination is identified to inform the remediation strategy.
Phase 3 requires that a remediation strategy be submitted to and approved by the LPA to ensure the site will be rendered suitable for its proposed use.
The development shall not be occupied until any previously approved remediation strategy has been carried out in full and a validation report
confirming completion of these works has been submitted to and approved in writing by the Local Planning Authority.
Reason: To ensure that any ground, water and associated gas contamination is identified and adequately addressed to ensure the safety of the development, the environment and to ensure the site is suitable for the proposed use to comply with the requirements of Class PA.2(1)(b)ii) and the provisions of paragraph W of the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended).
Related application(s):
P23/S3301/DIS