The development to which this permission relates must be begun not later than the expiration of three years beginning with the date of this permission.
Reason: By virtue of Sections 91 to 95 of the Town and Country Planning Act 1990 as amended by section 51 of the Planning and Compulsory Purchase Act 2004.
That the development hereby approved shall be carried out in accordance with the details shown on the following approved plans, PF001, 2324 14 002, 2016047 A 02 001 Rev O, 2016047 A P 02 201 REV E, 2016047 A P 02 101 REV J, 2016047 A P 02 102 REV F, 2016047 A 02 505, 2016047 A P 02 503 REV C, 2016047 A P 02 504 REV D, 2016047 A P 02 002 REV A and 2016047 A P 02 501 REV H, except as controlled or modified by conditions of this permission.
Reason: To secure the proper planning of the area in accordance with Development Plan policies.
Prior to the commencement of the development hereby approved, a schedule of all materials to be used in the external construction and finishes of the development hereby permitted shall be submitted to and approved in writing by the Local Planning Authority. This should also demonstrate how lintels, string courses and brickwork will be detailed/laid.
Reason: In the interests of the visual appearance of the development in accordance with Policy CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2 and D1 of the South Oxfordshire Local Plan 2011.
Related application(s):
P19/S0233/DISPrior to occupation of the site hereby permitted the proposed means of access onto the site from Charter Way, is to be formed and laid out and constructed strictly in accordance with the local highway authority's specifications and all ancillary works specified shall be undertaken.
Reason: In the interest of highway safety in accordance with Policy T1 of the South Oxfordshire Local Plan 2011.
The proposed vision splay shall be formed, laid out and constructed in accordance with detailed plans which shall be submitted to and approved in writing by the Local Planning Authority prior to the first occupation of the development and the vision splays shall not be obstructed by any object, structure, planting or other material with a height exceeding or growing above 0.6 metres as measured from carriageway level.
Reason: In the interest of highway safety in accordance with Policy T1 of the South Oxfordshire Local Plan 2011.
Related application(s):
P19/S0233/DISPrior to the first occupation of the development hereby approved a turning area and car parking spaces shall be provided within the curtilage of the site so that motor vehicles may enter, turn round and leave in a forward direction and vehicles may park off the highway. The turning area and parking spaces shall be constructed, laid out, surfaced, drained and completed to be compliant with sustainable drainage (SuDS) principles in strict accordance with specification details to be submitted to and approved in writing by the Local Planning Authority prior to the commencement of development. The turning area and car parking spaces shall be retained unobstructed except for the parking and manoeuvring of motor vehicles at all times.
Reason: In the interests of highway safety and to ensure the provision of off-street car parking in accordance with Policies T1 and T2 of the South Oxfordshire Local Plan 2011.
Related application(s):
P19/S0233/DISPrior to the first use or occupation of the development hereby permitted, covered cycle and mobility scooter parking facilities shall be provided on the site in accordance with details which shall be firstly submitted to and approved in writing by the Local Planning Authority. Thereafter, the covered cycle/mobility scooter parking facilities shall be permanently retained and maintained for the parking of cycles/mobility scooters in connection with the development.
Reason: In the interests of sustainability and to ensure a satisfactory form of development, in accordance with Government guidance contained within the National Planning Policy Framework and Policy T2 of the South Oxfordshire Local Plan 2011.
Related application(s):
P19/S0233/DISA Construction Traffic Management Plan (CTMP) shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of development. The approved CTMP shall be implemented prior to any works being carried out on site, and shall be maintained throughout the course of the development.
Reason: In the interests of highway safety and to mitigate the impact of construction vehicles on the surrounding highway network, road infrastructure and local residents, particularly at morning and afternoon peak traffic times and in accordance with Policy T1 of the South Oxfordshire Local Plan 2011.
Related application(s):
P19/S0233/DISThat a scheme for the landscaping of the site, including the planting of live trees and shrubs, shall be submitted to and approved in writing by the Local Planning Authority prior to the commencement of the development hereby permitted. The scheme shall be implemented prior to the first occupation or use as approved within 12 months of the commencement of the approved development and thereafter be maintained in accordance with the approved scheme. In the event of any of the trees or shrubs so planted dying or being seriously damaged or destroyed within 5 years of the completion of the development, a new tree or shrub or equivalent number of trees or shrubs, as the case may be, of a species first approved by the Local Planning Authority, shall be planted and properly maintained in a position or positions first approved in writing by the Local Planning Authority.
Reason: To help to assimilate the development into its surroundings in accordance with Policies CSEN1 and CSQ3 of the South Oxfordshire Core Strategy 2027 and Policies G2, C9 and D1 of the South Oxfordshire Local Plan 2011.
Related application(s):
P19/S0233/DISA residential travel information pack should be produced prior to occupation and then distributed to all residents at the point of occupation.
Reason - To ensure all residents are aware of the travel choices available to them from the outset in the interests of sustainability in accordance with Government guidance contained within the National Planning Policy Framework and Policy T2 of the South Oxfordshire Local Plan 2011.
Related application(s):
P19/S0233/DISPrior to any demolition and the commencement of the development a professional archaeological organisation acceptable to the Local Planning Authority shall prepare an Archaeological Written Scheme of Investigation, relating to the application site area, which shall be submitted to and approved in writing by the Local Planning Authority. Following the approval of the Written Scheme of Investigation and prior to any demolition on the site and the commencement of the development (other than in accordance with the agreed Written Scheme of Investigation), a staged programme of archaeological evaluation and mitigation shall be carried out by the commissioned archaeological organisation in accordance with the approved Written Scheme of Investigation. The programme of work shall include all processing, research and analysis necessary to produce an accessible and useable archive and a full report for publication which shall be submitted to the Local Planning Authority.
Reason: To enable an appropriate level of archaeological investigation of the area including excavation and recording, post excavation analysis and the publication of results in accordance with Policy CSEN3 of the South Oxfordshire Core Strategy 2027 and Policies G2, CON11, CON13, CON14 and E5 of the South Oxfordshire Local Plan 2011.
Related application(s):
P19/S0116/DIS,
P20/S3554/DISUpon completion of the development any external lighting shall be designed and installed so the main beam angle is not directed towards any receptors. To prevent glare, the lighting sources (bulbs and reflectors) shall not be visible from any adjacent properties. The luminaire's front glazing shall be kept parallel to the ground surface (i.e. facing downwards). This scheme shall also ensure that light trespass into the windows of any light sensitive premises shall not have a Vertical Illuminance greater than [2, 5, 10 or 25] Lux (in accordance with the Institution of Lighting Engineers Guidance Notes for the Reduction of Obtrusive Light GN01).
Reason: To protect the appearance of the area, the environment and wildlife, and local residents from light pollution in accordance with Policy EP3 of the South Oxfordshire Local Plan 2011.
Prior to the commencement of development, a full surface water drainage scheme shall be submitted to and approved in writing by the Local Planning Authority. The scheme shall include details of the size, position and construction of the drainage scheme, all coupled with calculations to evidence this. The details shall include a management plan setting out the maintenance of the drainage asset. An exceedance plan shall be submitted. The development shall be carried out in accordance with the approved details prior to the first occupation of the development hereby approved.
Reason: To prevent pollution and flooding in accordance with Policies EP1, EP4 and EP6 of the South Oxfordshire Local Plan 2011.
Related application(s):
P19/S0233/DISPrior to the commencement of development, a detailed scheme for foul water drainage of the development shall be submitted to and approved in writing by the Local Planning Authority. The approved scheme shall be fully implemented prior to the occupation of any new building.
Reason: To prevent pollution in accordance with Policy EP1 of the South Oxfordshire Local Plan 2011.
Related application(s):
P19/S0233/DISPrior to occupation of the development, a minimum of 5 bird nesting boxes, as recommended in section 5.3.2.2 of the supporting Preliminary Ecological Appraisal (Windrush Ecology, 25/10/2016, Ref: W2166_rep_Oakdale Court, Wallingford_25-10-16), shall be erected on site in suitable locations determined by a suitably qualified ecologist. Thereafter the bird nesting boxes shall be retained on site in perpetuity.
Reason: To ensure that there is a no net-loss of biodiveristy resource on the site, in accordance with Policy CSB1 of the SOCS and Policy C6 of the SOLP.
Related application(s):
P19/S0233/DIS